Ottawa Development Projects

900 Geographe#

Last updated: 2026-10-02 · ID: D07-16-26-0014

Summary#

This application presents a draft plan of subdivision for Cardinal Creek Village Phase 8, located at 900 Gègeographe Terrace, prepared for Tamarack (Cardinal Creek) Corporation.

Source: City-provided description and 2026-07-31 - Planning Rationale - D07-16-26-0014 (Page 1)
Status
Active (Comment Period has Ended/Issue Resolution)
Project Type
Plan of Subdivision
Property Type
Subdivision

Project Updates#

2026-10-02 Status
Status Updated
  • Status: Active (Comment Period has Ended/Issue Resolution)
2026-08-21 Status
Status Updated
  • Status: Active (Comment Period in Progress)
2026-08-20 Documents
Added 1 document
2026-08-17 Initial Update
Added description, 1 image and 27 documents
  • Status: Active (Community Heads Up - supporting documents to be posted later during circulation period)
  • This application presents a draft plan of subdivision for Cardinal Creek Village Phase 8, located at 900 Gègeographe Terrace, prepared for …

Site Plans, Elevations and Floor Plans#

Additional Information#

Date Initiated2026-07-08
WardWard 1 - Matthew Luloff

Documents#

TypeDocument
Application Summary2026-08-19 - Application Summary - D07-16-26-0014
Architectural Plans2026-07-31 - Street 1 Plan - D07-16-26-0014
Architectural Plans2026-07-31 - Sanitary Drainage Plan - D07-16-26-0014
Architectural Plans2026-07-31 - Ponding Area Plan - D07-16-26-0014
Architectural Plans2026-07-31 - Plan of Subdivision - D07-16-26-0014
Architectural Plans2026-07-31 - Plan Cover Page - D07-16-26-0014
Architectural Plans2026-07-31 - General Plan - D07-16-26-0014
Design Brief2026-07-31 - Geometric Road Design Drawings - D07-16-26-0014
Environmental2026-07-31 - Phase I Environmental Site Assessment Update - D07-16-26-0014
Erosion And Sediment Control Plan2026-08-04 - Erosion and Sediment Control Plan Stage 2 - D07-16-26-0014
Erosion And Sediment Control Plan2026-08-04 - Erosion and Sediment Control Plan Stage 1 - D07-16-26-0014
Geotechnical Report2026-07-31 - Grading Plan - D07-16-26-0014
Geotechnical Report2026-07-31 - Geotechnical Investigation - D07-16-26-0014
Noise Study2026-07-31 - Transportation Noise Assessment - D07-16-26-0014
Planning2026-07-31 - Planning Rationale - D07-16-26-0014
Site Servicing2026-08-04 - Servicing Brief - D07-16-26-0014
Stormwater Management2026-08-04 - Stormwater Management Design - D07-16-26-0014
Stormwater Management2026-07-31 - Storm Drainage Plan - D07-16-26-0014
Surveying2026-07-31 - Plan of Survey - D07-16-26-0014
Tree Information and Conservation2026-07-31 - Tree Conservation Report - D07-16-26-0014
2026-08-04 - Terrasse du Géographe Terrace - D07-16-26-0014
2026-08-04 - Standard Roadway Cross Sections - D07-16-26-0014
2026-08-04 - avenue de la FAMILLE-LAPORTE AVENUE - D07-16-26-0014
2026-07-31 - Turning Movement Diagram - D07-16-26-0014
2026-07-31 - General Notes - D07-16-26-0014
2026-07-31 - Details and Table - D07-16-26-0014
2026-07-31 - Details - D07-16-26-0014
2026-07-31 - Cross Sections - D07-16-26-0014