The proposal includes a Plan of Subdivision for a residential subdivision featuring 36 semi-detached dwellings, 26 townhouses, 2 detached dwellings, a park block, and two blocks reserved for low-rise apartment buildings estimated to accommodate 460 units. The subject property is designated General Urban Area on Official Plan Schedule B, which permits housing, employment, and retail uses, with building heights predominantly restricted to Low-Rise (4 storeys or less) per Policy 3 of Section 3.6.1.

Status
Post Approval (Draft Approved)
Property Type
Residential
Parkland

Location#

Select a marker to view the address.

Project Updates#

2024-10-05 Status
Status Updated
  • Status: Post Approval (Draft Approved)
2024-07-16 Initial Update
Added description and 35 documents
  • Status: Post Approval (In Appeal Period)
  • The City of Ottawa has received a concurrent Plan of Subdivision and Zoning By-law Amendment application to permit the development of a res…

Additional Information#

Date Initiated2019-07-18
WardWard 6 - Glen Gower

Documents#

TypeDocument
Application Summary2019-08-21 - Application Summary - D07-16-19-0018
Architectural Plans2023-07-17 - Pathways and Fencing Plan - D07-16-19-0018
Architectural Plans2023-07-17 - Master Plan Option 4-R07 - D07-16-19-0018
Architectural Plans2023-07-17 - Draft Plan of Subdivision - D07-16-19-0018
Architectural Plans2021-04-20 - Site Plan Map - D07-16-19-0018
Architectural Plans2021-04-20 - Site Plan - D07-16-19-0018
Architectural Plans2021-04-20 - Draft Plan of Subdivision - D07-16-19-0018
Architectural Plans2019-07-22 Site Plan D07-16-19-0018
Architectural Plans2019-07-22 Draft Plan of Subdivision D07-16-19-0018
Architectural Plans201-09-17 - Site Plan - D07-16-19-0018
Architectural Plans2024-12-27 - SIGNED Draft Plan of Subdivision - D07-16-19-0018
Civil Engineering Report2019-08-21- Civil Plans - D07-16-19-0018
Environmental2019-07-22 Phase 1 ESA D07-16-19-0018
Environmental2019-07-22 Integrated Environmental Review D07-16-19-0018
Environmental2019-07-22 Environmental Noise Assessment D07-16-19-0018
Existing Conditions2021-09-17 - Existing Residential Plan - D07-16-19-0018
Geotechnical Report2023-07-17 - Geotechnical Investigation - D07-16-19-0018
Geotechnical Report2021-04-20 - Geotechnical Investigation - D07-16-19-0018
Geotechnical Report2019-07-22 Geotechnical Investigation D07-16-19-0018
Noise Study2023-07-17 - Noise Control Feasibility Study - D07-16-19-0018
Planning2021-04-20 - Planning Rationale - D07-16-19-0018
Planning2019-07-22 Planning Rationale D07-16-19-0018
Site Servicing2023-07-17 - Servicing and Stormwater Management Report - D07-16-19-0018
Site Servicing2021-09-17 - Functional Servicing and Stormwater Management Report - D07-16-19-0018
Site Servicing2021-04-20 - Functional Servicing and Stormwater Management Report - D07-16-19-0018
Site Servicing2019-08-21 - Functional Servicing and SWM Report - D07-16-19-0018
Transportation Analysis2023-07-17 - TIA Addendum Memo - D07-16-19-0018
Transportation Analysis2019-07-22 Transportation Impact Assessment D07-16-19-0018
Tree Information and Conservation2019-07-22 EIS and TCR D07-16-19-0018
2024-07-19 - Delegated Authority Report - D07-16-19-0018
2023-07-17 - Draft Proposed Roadway Modifications - D07-16-19-0018
2021-09-17 - Residential Road Allowance - D07-16-19-0018
2021-09-17 - Proposed Roadway Modifications - D07-16-19-0018
2019-07-22 Pavement Marking, Signage and Geometric D07-16-19-0018
2019-07-22 Maple Grove Extension RMA D07-16-19-0018
2024-12-27 - Conditions of Draft Approval - D07-16-19-0018