Ottawa Development Projects

2045 Mer-Bleue#

Last updated: 2026-09-28 · ID: D07-12-26-0095

Summary#

This proposal involves an addition to the existing Orleans Kia Dealership. The development is situated around stormwater catchment areas K-4, K-5, and K-9, which primarily consist of asphalt surfaces. Runoff from catchments K-11, K-8, K-10, and K-4 is directed to the pipe network within catchments K-9 and K-5, respectively, with the building’s roof leader connecting to the pipe network in K-5.

Status
Active (On Circulation; Initial Submission Review)
Project Type
Site Plan Control
Property Type
Commercial

Building Scale (Max.) Based on elevation drawings. Values may be approximate. See sources for exact figures.
Low-rise · 2 storeys · 6.97 m

Location#

Select a marker to view the address.

Project Updates#

2026-09-28 Initial Update
Added description, height and 8 documents
  • Status: Active (On Circulation; Initial Submission Review)
  • This proposal involves an addition to the existing Orleans Kia Dealership. The development is situated around stormwater catchment areas K-…
  • Height: 2 storeys, 6.97 m

Additional Information#

Date Initiated2026-08-31
WardWard 19 - Catherine Kitts

Documents#

TypeDocument
Application Summary2026-09-25 - Application Summary - D07-12-26-0095
Architectural Plans2026-08-31 - Architectural Package - D07-12-26-0095
Civil Engineering Report2026-08-31 - Civil Drawings - D07-12-26-0095
Environmental2026-08-31 - Phase I Environmental Site Assessment - D07-12-26-0095
Geotechnical Report2026-08-31 - Geotechnical Review and Recommendations - D07-12-26-0095
Site Servicing2026-08-31 - Servicing and SWM Report - D07-12-26-0095
Surveying2026-08-31 - Survey - D07-12-26-0095
Tree Information and Conservation2026-08-31 - TCR and Landscape Plan - D07-12-26-0095