Ottawa Development Projects

2180 Montreal/972 Shefford Rd.#

Last updated: 2026-05-16 · ID: D07-12-26-0042

Summary#

The City of Ottawa has received a Zoning By-law Amendment and Site Plan Control application to permit the redevelopment of the existing gas station. A drive-through restaurant will be added to the site. The requested rezoning is to expand the AM10 / MS2 zone to cover 972 Shefford Road, as the applicant has acquired this property to facilitate the development.

Status
Active (On Circulation; Initial Submission Review)
Type
Site Plan Control

Building Scale (Max.) Based on elevation drawings. Values may be approximate. See sources for exact figures.
Low-rise · 1 storey · 5.4 m Data Quality Note Height was partially estimated using visual scale. This may be approximate.

Location#

Select a marker to view the address.

Project Updates#

2026-05-16 Status
Status Updated
  • Status: Active (On Circulation; Initial Submission Review)
2026-05-15 Documents
Added 1 document
2026-05-14 Status
Status Updated
  • Status: Active (Circulation Package Prepared)
2026-05-13 Initial Update
Added description and height
  • Status: Active (Community Heads Up - supporting documents to be posted later during circulation period)
  • The City of Ottawa has received a Zoning By-law Amendment and Site Plan Control application to permit the redevelopment of the existing gas…
  • Height: 5.4 m
  • Storeys: 1 storey

Additional Information#

Date Initiated2026-04-27
WardWard 11 - Tim Tierney

Documents#

TypeDocument
Application Summary2026-05-14 - Application Summary - D07-12-26-0042
Architectural Plans2026-04-27 - Site Plan - D07-12-26-0042
Architectural Plans2026-04-27 - Redevelopment VIZ plan - D07-12-26-0042
Architectural Plans2026-04-27 - Floorplans & Elevations - D07-12-26-0042
Environmental2026-04-27 -Terrapex Phase Two ESA - D07-12-26-0042
Environmental2026-04-27 - Phase One ESA - D07-12-26-0042
Geotechnical Report2026-04-27 - Site Grading Plan - D07-12-26-0042
Geotechnical Report2026-04-27 - Geotechnical Investigation Report Final - D07-12-26-0042
Landscape Plan2026-04-27 - LandScape Plan - D07-12-26-0042
Noise Study2026-04-27 - Starionary Noise Study Final - D07-12-26-0042
Stormwater Management2026-04-27 - Stormwater Management Report stamped - D07-12-26-0042
Surveying2026-04-27 - SURVEY REPORT - D07-12-26-0042
Transportation Analysis2026-04-27 - Montreal Road TIA - D07-12-26-0042
Tree Information and Conservation2026-04-27 - Tree Conservation Report - D07-12-26-0042
2026-04-27 - SPA Arch - D07-12-26-0042
2026-04-27 - Slope Stability Assessment - D07-12-26-0042
2026-04-27 - P306 stamped - D07-12-26-0042
2026-04-27 - P305 stamped - D07-12-26-0042
2026-04-27 - P304 stamped - D07-12-26-0042
2026-04-27 - P303 stamped - D07-12-26-0042
2026-04-27 - P302 stamped - D07-12-26-0042
2026-04-27 - P301 stamped - D07-12-26-0042
2026-04-27 - P300 stamped - D07-12-26-0042
2026-04-27 - FSR stamped - D07-12-26-0042
2026-04-27 - Boundary - D07-12-26-0042