Ottawa Development Projects

251 Linseed#

Last updated: 2026-03-25 · ID: D07-12-25-0148

Summary#

A Site Plan Control application has been submitted for a planned unit development consisting of a mixed-use building and three back-to-back townhouse blocks. The proposed development includes 72 residential units, 705 m2 of commercial space, and 117 parking spaces.

Status
File Pending (Application File Pending)

Building Scale (Max.) Based on elevation drawings. Values may be approximate. See sources for exact figures.
Mid-rise · 4 storeys Data Quality Note Text was extracted using optical character recognition. This may introduce artifacts or misreads. · 13.4 m Data Quality Note Text was extracted using optical character recognition. This may introduce artifacts or misreads.

Site Plans, Elevations and Floor Plans#

Additional Information#

Date Initiated2025-11-12
WardWard 4 - Cathy Curry

Documents#

TypeDocument
Architectural Plans2025-12-19 - Site Plan - D07-12-25-0148
Architectural Plans2025-11-12 - Townhouse - Precedent Building Elevations - D07-12-25-0148
Architectural Plans2025-11-12 - Site Grading Plan - D07-12-25-0148
Architectural Plans2025-11-12 - Sanitary Drainage Plan - D07-12-25-0148
Architectural Plans2025-11-12 - Plan 4M-1767 - D07-12-25-0148
Architectural Plans2025-11-12 - Notes and Legends Plan - D07-12-25-0148
Architectural Plans2025-11-12 - Mixed-Use Building - Precedent Building Elevations - D07-12-25-0148
Architectural Plans2026-03-23 - SPA Plans & Details - D07-12-25-0148
Architectural Plans2026-03-23 - Site Servicing Plan - D07-12-25-0148
Architectural Plans2026-03-23 - Site Plan - D07-12-25-0148
Architectural Plans2026-03-23 - Sanitary Drainage Plan - D07-12-25-0148
Architectural Plans2026-03-23 - Notes & Legends Plan - D07-12-25-0148
Architectural Plans2026-03-23 - Grading Plan - D07-12-25-0148
Architectural Plans2026-03-23 - Existing Conditions Plan - D07-12-25-0148
Architectural Plans2026-03-23 - Erosion Control Plan & Detail Sheet - D07-12-25-0148
Design Brief2025-11-12 - Urban Design Brief - D07-12-25-0148
Erosion And Sediment Control Plan2025-11-12 - Erosion Control Plan - D07-12-25-0148
Existing Conditions2025-11-12 - Existing Conditions Plan - D07-12-25-0148
Geotechnical Report2025-12-19 - Geotechnical Investigation - D07-12-25-0148
Landscape Plan2025-12-19 - Landscape Plans - D07-12-25-0148
Noise Study2025-11-12 - Transportation Noise Assessment - D07-12-25-0148
Planning2025-11-12 - Zoning Confirmation Report - D07-12-25-0148
Site Servicing2025-11-12 - Site Servicing Plan - D07-12-25-0148
Site Servicing2025-11-12 - Site Servicing and Stormwater Management Report - D07-12-25-0148
Stormwater Management2025-11-12 - Storm Drainage Plan - D07-12-25-0148
Stormwater Management2026-03-23 - Storm Drainage Plan - D07-12-25-0148
Stormwater Management2026-03-23 - Site Servicing & Stormwater Management Report - D07-12-25-0148
Surveying2025-12-19 - TOPO Plan of Survey - D07-12-25-0148
Transportation Analysis2025-11-12 - Transportation Impact Assessment - D07-12-25-0148
Transportation Analysis2025-11-12 - Traffic Management Plan - D07-12-25-0148
2025-11-12 - Phase I - Environmental Site Assessment Update - D07-12-25-0148
2026-01-15 - Application Summary - D07-12-25-0148
2026-03-23 - Zoning Confirmation Report - D07-12-25-0148
2026-03-23 - Transportation Impact Assessment - D07-12-25-0148
2026-03-23 - Stage 3 Achaeological Assessment - D07-12-25-0148
2026-03-23 - Stage 2 Achaeological Assessment - D07-12-25-0148
2026-03-23 - Stage 1 Achaeological Assessment - D07-12-25-0148
2026-03-23 - Electrical Specifications 1 of 2 - D07-12-25-0148
2026-03-23 - Drawings - D07-12-25-0148
2026-03-23 - Architecture Drawings 01 - D07-12-25-0148
2026-03-23 - Architecture Drawings 00 - D07-12-25-0148