Ottawa Development Projects

2104 Roger Stevens Dr.#

Last updated: 2026-09-29 · ID: D07-12-25-0049

Summary#

The proposal encompasses the demolition of the existing temple, construction of a new temple, and conversion of temporary temple servicing infrastructure into a priest residence. This development will include sixty-one parking spaces, comprising sixty for the place of worship and one for the residence, alongside three bike parking spaces. The site will retain its two existing access points, and the rear portion within the floodplain overlay will remain undeveloped.

Source: City-provided description
Status
Inactive (Agreement Registered - Final Legal Clearance Given)
Project Type
Site Plan Control
Property Type
Residential
Institutional

Building Scale (Max.) Based on elevation drawings. Values may be approximate. See sources for exact figures.
Mid-rise · 4 storeys · 22.6 m Data Quality Note Height was partially estimated using visual scale. This may be approximate.

Location#

Select a marker to view the address.

Project Updates#

2026-09-29 Status
Status Updated
  • Status: Inactive (Agreement Registered - Final Legal Clearance Given)
2026-03-07 Status
Status Updated
  • Status: Post Approval (Receipt of Agreement from Owner Pending)
2025-12-03 Status
Status Updated
  • Status: Post Approval (Request for Agreement Received)
2025-11-27 Status
Status Updated
  • Status: Inactive (Notice of Decision Sent)
2025-11-25 Status
Status Updated
  • Status: Inactive (Application Approved)
2025-11-13 Documents
Added 1 document
2025-09-19 Status
Status Updated
  • Status: File Pending (Under Review with Applicant)
2025-09-12 Status
Status Updated
  • Status: Active (Initial Review Comments Sent)
2025-09-11 Status
Status Updated
  • Status: Active (Initial Circulation Period Completed)
2025-08-25 Initial Update
Added description, height, 3 images and 68 documents
  • Status: Active (On Circulation; Initial Submission Review)
  • The proposal encompasses the demolition of the existing temple, construction of a new temple, and conversion of temporary temple servicing …
  • Height: 3 storeys
  • 1 elevation
  • 2 floor plans

Site Plans, Elevations and Floor Plans#

Additional Information#

Date Initiated2025-04-17
WardWard 21 - David Brown

Documents#

TypeDocument
Application Summary2025-08-25 - Application Summary - D07-12-25-0049
Archaelogical Assessment2025-08-01 - Stage 1 & 2 Archeological Assessment - D07-12-25-0049
Archaelogical Assessment2025-08-01 - Archaeological Report - D07-12-25-0049
Archaelogical Assessment2025-04-17 - Stage 1 and 2 Archaeological Assessment - D07-12-25-0049
Archaelogical Assessment2025-04-17 - archaeological assessment - D07-12-25-0049
Architectural Plans2025-08-01 - Site Plan Details - D07-12-25-0049
Architectural Plans2025-08-01 - Site Plan - D07-12-25-0049
Architectural Plans2025-08-01 - Proposed Residence Elevations SP04 - D07-12-25-0049
Architectural Plans2025-08-01 - Proposed Residence Elevations SP03 - D07-12-25-0049
Architectural Plans2025-08-01 - Overrall Site Plan & Post Development Drainage Plan - D07-12-25-0049
Architectural Plans2025-08-01 - Notes & Details - D07-12-25-0049
Architectural Plans2025-06-20 - Site Plans SP01-SP05 - D07-12-25-0049
Architectural Plans2025-04-17 - Site Plan and Post Development Drainage Plan - D07-12-25-0049
Architectural Plans2025-04-17 - Site Plan - D07-12-25-0049
Architectural Plans2025-04-17 - Notes and Details Plan - D07-12-25-0049
Architectural Plans2025-04-17 - Elevation Plan Priest Residence - D07-12-25-0049
Architectural Plans2025-04-17 - Details Plan - D07-12-25-0049
Architectural Plans2025-04-17 - Details Plan - D07-12-25-0049
Architectural Plans2024-04-17 - Site Plan Details - D07-12-25-0049
Architectural Plans2024-04-17 - Elevations Plan Temple - D07-12-25-0049
Architectural Plans2025-10-29 - Site Plan Details - D07-12-25-0049
Architectural Plans2025-10-29 - Site Plan - D07-12-25-0049
Architectural Plans2025-10-29 - Proposed Temple Elevations - D07-12-25-0049
Architectural Plans2025-10-29 - Proposed Residence Elevations - D07-12-25-0049
Architectural Plans2025-11-12- Notes & Details - D07-12-25-0049
Architectural Plans2025-11-25 - Signed Site Plan Approval Report - D07-12-25-0049
Architectural Plans2025-11-25 - Approved Site Plan Details - D07-12-25-0049
Architectural Plans2025-11-25 - Approved Site Plan - D07-12-25-0049
Architectural Plans2025-11-25 - Approved Proposed Temple Elevations - D07-12-25-0049
Architectural Plans2025-11-25 - Approved Proposed Residence Elevations - D07-12-25-0049
Architectural Plans2025-11-25 - Approved Overall Site Plan & Post Development Drainage Plan - D07-12-25-0049
Architectural Plans2025-11-25 - Approved Notes & Details C-5 - D07-12-25-0049
Civil Engineering Report2025-06-20 - Civil Plans C-1 to C-7 - D07-12-25-0049
Environmental2025-08-01 - Environmental Noise Control Study - D07-12-25-0049
Environmental2025-04-17 - Environmental Noise Control Study - D07-12-25-0049
Erosion And Sediment Control Plan2025-08-01 - Erosion & Sediment Control Plan - D07-12-25-0049
Erosion And Sediment Control Plan2025-04-17 - Erosion and Sediment Control Plan - D07-12-25-0049
Erosion And Sediment Control Plan2025-11-25 - Approved Erosion & Sediment Control Plan - D07-12-25-0049
Floor Plan2025-08-01 - Proposed Temple Basement Main Floor Plan - D07-12-25-0049
Floor Plan2025-08-01 - Proposed Temple Basement Floor Plan - D07-12-25-0049
Floor Plan2025-08-01 - Proposed Residence Floor Plans - D07-12-25-0049
Floor Plan2025-06-20 - Floor Plans A100-A103 - D07-12-25-0049
Geotechnical Report2025-08-01 - Hydrogeological Assessment and Terrain Analysis Report - D07-12-25-0049
Geotechnical Report2025-08-01 - Grading Plan - D07-12-25-0049
Geotechnical Report2025-08-01 - Geotechnical Investigation - D07-12-25-0049
Geotechnical Report2025-06-20 - Hydrogeological Assessment and Terrain Analysis Report - D07-12-25-0049
Geotechnical Report2025-04-17 - Hydrogeological Assessment and Terrain Analysis Report - D07-12-25-0049
Geotechnical Report2025-04-17 - Grading Plan - D07-12-25-0049
Geotechnical Report2025-04-17 - Geotechnical Investigation - D07-12-25-0049
Geotechnical Report2025-11-25 - Approved Grading Plan - D07-12-25-0049
Landscape Plan2025-08-01 - Landscape Plan - D07-12-25-0049
Landscape Plan2025-06-20 - Landscape Plan - D07-12-25-0049
Landscape Plan2025-04-17 - Landscape Plan - D07-12-25-0049
Landscape Plan2025-10-29 - Landscape Plan - D07-12-25-0049
Landscape Plan2025-11-25 - Approved Landscape Plan - D07-12-25-0049
Planning2025-08-01 - Zoning Confirmation Report - D07-12-25-0049
Planning2025-06-20 - Zoning Confirmation Report - D07-12-25-0049
Planning2024-04-17 - Zoning Confirmation Report - D07-12-25-0049
Shadow Study2025-08-01 - Fire Geometric Assessment - D07-12-25-0049
Site Servicing2025-08-01 - Site Servicing Study, Stormwater Management Report - D07-12-25-0049
Site Servicing2025-08-01 - Site Servicing Plan - D07-12-25-0049
Site Servicing2025-06-20 - Site Servicing & SWM Report - D07-12-25-0049
Site Servicing2025-04-17 - Site Servicing Study and Stormwater Management Report - D07-12-25-0049
Site Servicing2025-04-17 - Site Servicing Plan - D07-12-25-0049
Site Servicing2025-11-25 - Approved Site Servicing Plan - D07-12-25-0049
Surveying2025-08-01 - Topographic Sketch - D07-12-25-0049
Surveying2025-08-01 - Plan Of Survey - D07-12-25-0049
Surveying2025-04-17 - Topographic Sketch - D07-12-25-0049
Surveying2024-04-17 - Plan Of Survey - D07-12-25-0049
Transportation Analysis2025-08-01 - Traffic Brief - D07-12-25-0049
Transportation Analysis2025-06-20 - Transportation Brief - D07-12-25-0049
Transportation Analysis2025-04-17 - Transportation Brief - D07-12-25-0049
Tree Information and Conservation2025-08-01 - Tree Conservation Report - D07-12-25-0049
Tree Information and Conservation2025-06-20 - Tree Conservation Report V4 - D07-12-25-0049
Tree Information and Conservation2025-04-17 - Tree Conservation Report - D07-12-25-0049
2025-08-01 - Sign and Molok Bin Design - D07-12-25-0049
2025-08-01 - Septic System - D07-12-25-0049
2025-08-01 - Retaining Wall Design - D07-12-25-0049
2025-08-01 - Details - D07-12-25-0049
2025-06-20 - Retaining Wall Design SS1 Rev 2 - D07-12-25-0049
2025-06-20 - AutoTURN Analysis - D07-12-25-0049
2025-04-17 - Septic System - D07-12-25-0049
2025-04-17 - Retaining Wall Design - D07-12-25-0049
2025-04-17 - AutoTURN Analysis - D07-12-25-0049
2025-10-29 - Water Budget Assessment - D07-12-25-0049
2025-10-29 - Sign and Molok Bin Design - D07-12-25-0049
2025-11-25 - Approved Sign and Molok Design - D07-12-25-0049
2025-11-25 - Approved Septic System - D07-12-25-0049
2025-11-25 - Approved Retaining Wall Design - D07-12-25-0049
2025-11-25 - Approved Details C-6 - D07-12-25-0049