2104 Roger Stevens Dr.#
Summary#
The proposed development consists of three phases; construction of a temporary temple servicing infrastructure and parking, demolish the existing temple, construct a new temple, and convert the temporary temple into a priest residence. The development will contain sixty-one parking spaces total (60 place of worship, 1- residence) and three bike parking spaces. The site will maintain the two site accesses. The rear portion of the site is within the floodplain overlay and does not feature any development. The site will be on private well and septic.
Post Approval (Receipt of Agreement from Owner Pending)
Site Plan Control
Building Scale (Max.)
Based on elevation drawings. Values may be approximate. See sources for exact figures.
Mid-rise · 4 storeys
· 22.6 m
Data Quality Note
Height was partially estimated using visual scale. This may be approximate.
Location#
Project Updates#
- Status: Post Approval (Receipt of Agreement from Owner Pending)
- Status: Post Approval (Request for Agreement Received)
- Status: Inactive (Notice of Decision Sent)
- Height: 22.6 m
- Storeys: 4 storeys
- 2025-11-25 - Signed Site Plan Approval Report - D07-12-25-0049
- 2025-11-25 - Approved Site Servicing Plan - D07-12-25-0049
- 2025-11-25 - Approved Site Plan Details - D07-12-25-0049
- 2025-11-25 - Approved Site Plan - D07-12-25-0049
- 2025-11-25 - Approved Sign and Molok Design - D07-12-25-0049
- 2025-11-25 - Approved Septic System - D07-12-25-0049
- 2025-11-25 - Approved Retaining Wall Design - D07-12-25-0049
- 2025-11-25 - Approved Proposed Temple Elevations - D07-12-25-0049
- 2025-11-25 - Approved Proposed Residence Elevations - D07-12-25-0049
- 2025-11-25 - Approved Overall Site Plan & Post Development Drainage Plan - D07-12-25-0049
- 2025-11-25 - Approved Notes & Details C-5 - D07-12-25-0049
- 2025-11-25 - Approved Landscape Plan - D07-12-25-0049
- 2025-11-25 - Approved Grading Plan - D07-12-25-0049
- 2025-11-25 - Approved Erosion & Sediment Control Plan - D07-12-25-0049
- 2025-11-25 - Approved Details C-6 - D07-12-25-0049
- Status: Inactive (Application Approved)
- Status: Active (Applicant Revised Document Received)
- 2025-10-29 - Water Budget Assessment - D07-12-25-0049
- 2025-10-29 - Site Plan Details - D07-12-25-0049
- 2025-10-29 - Site Plan - D07-12-25-0049
- 2025-10-29 - Sign and Molok Bin Design - D07-12-25-0049
- 2025-10-29 - Proposed Temple Elevations - D07-12-25-0049
- 2025-10-29 - Proposed Residence Elevations - D07-12-25-0049
- 2025-10-29 - Landscape Plan - D07-12-25-0049
- Status: File Pending (Under Review with Applicant)
- Status: Active (Initial Review Comments Sent)
- Status: Active (Initial Circulation Period Completed)
- Status: Active (On Circulation; Initial Submission Review)
- The proposed development consists of three phases; construction of a temporary temple servicing infrastructure and parking, demolish the ex…
- 1 elevation
- 2 floor plans
- 2025-08-01 - Proposed Residence Floor Plans - D07-12-25-0049
- 2025-08-01 - Proposed Temple Basement Floor Plan - D07-12-25-0049
- 2025-08-01 - Proposed Temple Basement Main Floor Plan - D07-12-25-0049
Site Plans, Elevations and Floor Plans#
Additional Information#
| Date Initiated | 2025-04-17 |
| Ward | Ward 21 - David Brown |