Summary#
The proposal involves constructing a nine-storey, mixed-use building with a gross floor area of 15,080 square metres located on the northeast corner of 155 Dun Skipper Drive.
Source:
City-provided description
Status
Inactive (Notice of Decision Sent)
Inactive (Notice of Decision Sent)
Project Type
Site Plan Control
Site Plan Control
Property Type
Mixed-Use
Mixed-Use
Building Scale (Max.)
Based on elevation drawings. Values may be approximate. See sources for exact figures.
Mid-rise · 9 storeys
Data Quality Note
Text was extracted using optical character recognition. This may introduce artifacts or misreads.
· 34.6 m
Data Quality Note
Height was partially estimated using visual scale. This may be approximate.
Data Quality Note
Text was extracted using optical character recognition. This may introduce artifacts or misreads.
Renders#
Location#
Select a marker to view the address.
Project Updates#
Added 1 image and 13 documents
- 2026-09-21 - APPROVED Transportation Impact Assessment Addendum - D07-12-24-0169
- 2026-09-21 - APPROVED Shadow Study - D07-12-24-0169
- 2026-09-21 - APPROVED Ramp & Stair Details & Section - D07-12-24-0169
- 2026-09-21 - APPROVED Phase II Environmental Site Assessment - D07-12-24-0169
- 2026-09-21 - APPROVED Phase 1 Environmental Site Assessment - D07-12-24-0169
- 2026-09-21 - APPROVED Pedestrian Level Wind Study - D07-12-24-0169
- 2026-09-21 - APPROVED Landscape Plan - D07-12-24-0169
- 2026-09-21 - APPROVED Geotechnical Investigation - D07-12-24-0169
- 2026-09-21 - APPROVED Detailed Traffic Noise Study - D07-12-24-0169
- 2026-09-21 - APPROVED Design Brief - D07-12-24-0169
- 2026-09-21 - APPROVED Civil Plans - D07-12-24-0169
- 2026-09-21 - APPROVED Architectural Package - D07-12-24-0169
- 2026-09-21 - APPROVED Archealogical Assessment - D07-12-24-0169
Status Updated
- Status: Inactive (Application Approved)
Added 1 image and 16 documents
- 2025-12-12 -EXISTING CONDITIONS - D07-12-24-0169
- 2025-12-12 - STORM DRAINAGE AREA PLAN - D07-12-24-0169
- 2025-12-12 - SITEPLAN SERVICING - D07-12-24-0169
- 2025-12-12 - SEDIMENT AND EROSION CONTROL PLAN - D07-12-24-0169
- 2025-12-12 - SANITARY DRAINAGE AREA PLAN - D07-12-24-0169
- 2025-12-12 - PONDING PLAN - D07-12-24-0169
- 2025-12-12 - NOTES AND LEGEND
- 2025-12-12 - Landscape Plan - D07-12-24-0169
- 2025-12-12 - INTERIM STORM DRAINAGE AREA PLAN - D07-12-24-0169
- 2025-12-12 - INTERIM PONDING PLAN - D07-12-24-0169
- 2025-12-12 - GRADING PLAN - D07-12-24-0169
- 2025-12-12 - Design Brief - D07-12-24-0169
- 2025-12-12 - COVER - D07-12-24-0169
- 2025-12-12 - Civil Drawings - D07-12-24-0169
- 2025-12-12 - Architectural Drawings - D07-12-24-0169 (2)
- 2025-12-12 - Architectural Drawings - D07-12-24-0169
Status Updated
- Status: File Pending (Application File Pending)
Status Updated
- Status: Active (Additional Submission Circulation Period Completed)
Status Updated
- Status: File Pending (Application File Pending)
Status Updated
- Status: Active (Additional Submission Deemed Adequate)
Status Updated
- Status: File Pending (Application File Pending)
Added 1 document
Status Updated
- Status: Active (On Circulation; Initial Submission Review)
Added description and 2 documents
- Status: Active (Circulation Package Prepared)
- Updated description:The proposal involves constructing a nine-storey, mixed-use building with a gross floor area of 15,080 square metres located on the northea…
Added description, height, 31 images and 37 documents
- Status: Active (Community Heads Up - supporting documents to be posted later during circulation period)
- The proposal includes one nine-storey mixed-use apartment building featuring ground floor commercial uses and building amenities, with the …
- Height: 9 storeys, 33.9 m
- 6 renders
- 25 site plans
- 2025-05-12 - Zoning Confirmation Report - D07-12-24-0169
- 2025-05-12 - Urban Design Brief - D07-12-24-0169
- 2025-05-12 - Traffic Noise Study - D07-12-24-0169
- 2025-05-12 - Topographic Survey - D07-12-24-0169
- 2025-05-12 - Storm Drainage Area Plan - D07-12-24-0169s
- 2025-05-12 - Sediment and Erosion Control Plan - D07-12-24-0169
- 2025-05-12 - Sanitary Drainage Area Plan - D07-12-24-0169
- 2025-05-12 - Ponding Plan - D07-12-24-0169
- 2025-05-12 - Plan of Survey - D07-12-24-0169
- 2025-05-12 - Phase 1 Environmental Site Assessment - D07-12-24-0169
- 2025-05-12 - Notes & Legend - D07-12-24-0169
- 2025-05-12 - Landscape Plan - D07-12-24-0169
- 2025-05-12 - Interim Storm Drainage Area Plan - D07-12-24-0169
- 2025-05-12 - Interim Ponding Plan - D07-12-24-0169
- 2025-05-12 - Interim Grading Plan - D07-12-24-0169
- 2025-05-12 - Grading Plan - D07-12-24-0169
- 2025-05-12 - General Plan of Services - D07-12-24-0169
- 2025-05-12 - Design Brief - D07-12-24-0169
- 2025-05-12 - Cover Page - D07-12-24-0169
- 2025-05-12 - Civil Plans - D07-12-24-0169
- 2025-05-12 - Architectural Package - D07-12-24-0169
- 2025-05-12 - Arcadis Response Design Brief - D07-12-24-0169
- 2025-05-12 - Arcadis Response Civil Package - D07-12-24-0169
- 2025-02-27 - Transportation Impact Assessment Addendum - D07-12-24-0169
- 2025-02-27 - Survey - D07-12-24-0169
- 2025-02-27 - Shadow Study - D07-12-24-0169
- 2025-02-27 - Preliminary Construction Management Plan - D07-12-24-0169
- 2025-02-27 - Phase II - Environmental Site Assessment - D07-12-24-0169
- 2025-02-27 - Pedestrian Level Wind Study - D07-12-24-0169
- 2025-02-27 - Images - D07-12-24-0169
- 2025-02-27 - Geotechnical Investigation - D07-12-24-0169
- 2025-02-27 - Archealogical Assessment - D07-12-24-0169
- 2025-02-25 - Zoning Confirmation Report - D07-12-24-0169
- 2025-02-25 - Grading & Servicing Memo - D07-12-24-0169
- 2025-02-25 - Flow Control Roof Drainage Declaration - D07-12-24-0169
- 2025-02-25 - Civil Package - D07-12-24-0169
- 2025-02-25 - Architectural Package - D07-12-24-0169
Site Plans, Elevations and Floor Plans#
Additional Information#
| Date Initiated | 2024-12-12 |
| Ward | Ward 22 - Steve Desroches |


































