Ottawa Development Projects

2700 Swansea Cres.#

Last updated: 2025-09-11 · ID: D07-12-22-0179

Summary#

An addition of approximately 1,540 square meters will be constructed above the parking lot on the south side of the existing two-storey medium manufacturing facility to provide additional research and office space and expand current operations.

Source: City-provided description
Status
Post Approval (Request for Agreement Received)
Project Type
Site Plan Control
Property Type
Industrial
Addition / Renovation

Building Scale (Max.) Based on elevation drawings. Values may be approximate. See sources for exact figures.
Low-rise · 2 storeys · 7.55 m

Location#

Select a marker to view the address.

Project Updates#

2025-09-11 Status
Status Updated
  • Status: Post Approval (Request for Agreement Received)
2025-01-07 Status
Status Updated
  • Status: Post Approval (Preliminary Consensus)
2024-12-06 Status
Status Updated
  • Status: Active (Preliminary Consensus)
2023-12-11 Initial Update
Added description, 6 images and 23 documents
  • Status: Post Approval (Request for Agreement Received)
  • Proposal to construct addition to the existing 2-storey medium manufacturing facility at 2700 Swansea Crescent, approximately 1,540SM large…
  • 3 site plans
  • 1 elevation
  • 2 floor plans

Site Plans, Elevations and Floor Plans#

Additional Information#

Date Initiated2022-12-21
WardWard 10 - Jessica Bradley

Documents#

TypeDocument
Application Summary2023-03-02 - Application Summary - D07-12-22-0179
Architectural Plans2023-05-08 - Architectural Drawings - D07-12-22-0179
Architectural Plans2022-12-21 - Site Plan - D07-12-22-0179
Architectural Plans2022-12-21 - Architectural Building Elevations - D07-12-22-0179
Design Brief2022-12-21 - Design Brief - D07-12-22-0179
Drainage Plan2023-05-08 - DRAINAGE PLAN - D07-12-22-0179
Electrical Plan2023-05-08 - Electrical Drawings - d07-12-22-0179
Electrical Plan2022-12-21 - Site Lighting Certification Letter - D07-12-22-0179
Environmental2022-12-21 - Phase One Environmental Site Assessment - D07-12-22-0179
Erosion And Sediment Control Plan2023-05-08 - EROSION AND SEDIMENT - D07-12-22-0179
Geotechnical Report2023-05-08 - Grading Plan - D07-12-22-0179
Geotechnical Report2022-12-21 - Signed Geotechnical Investigation - D07-12-22-0179
Geotechnical Report2022-12-21 - Draft Geotechnical Investigation Report - D07-12-22-0179
Landscape Plan2023-05-08 - Landscape Drawings - D07-12-22-0179
Landscape Plan2022-12-21 - Landscape Plan - D07-12-22-0179
Site Servicing2023-05-08 - Servicing Plan - D07-12-22-0179
Site Servicing2023-05-08 - SERVICING AND STORMWATER MANAGEMENT REPORT - D07-12-22-0179
Site Servicing2022-12-21 - Servicing and SWM Report - D07-12-22-0179
Site Servicing2022-12-21 - Grading, Site Servicing, Sediment & Erosion Control, Drainage Plan - D07-12-22-0179
Surveying2022-12-21 - Survey Plan - D07-12-22-0179
Tree Information and Conservation2023-05-08 - Tree Conservation Report - D07-12-22-0179
Tree Information and Conservation2022-12-21 - Tree Conservation Report - D07-12-22-0179
2023-05-08 - FLOW CONTROL ROOF DRAINAGE DECLARATION - D07-12-22-0179