Ottawa Development Projects

5315 Abbott St.#

Last updated: 2025-12-02 · ID: D07-12-22-0157

Summary#

Propose to contruct a 18 classroom, 2 storey addition to the existing secondary school building and a pavillion adjacent to the dome.

Status
Post Approval (Agreement Signed)
Type
Site Plan Control

Building Scale (Max.) Based on elevation drawings. Values may be approximate. See sources for exact figures.
Low-rise · 1 storey · 8 m

Renders#

Location#

Select a marker to view the address.

Project Updates#

2025-12-02 Status
Status Updated
  • Status: Post Approval (Agreement Signed)
2024-07-03 Initial Update
Added description, height, 12 images and 1 document
  • Status: Post Approval (Receipt of Agreement from Owner Pending)
  • Propose to contruct a 18 classroom, 2 storey addition to the existing secondary school building and a pavillion adjacent to the dome.
  • Height: 8.0 m
  • Storeys: 1 storey
  • 8 renders
  • 3 site plans

Site Plans, Elevations and Floor Plans#

Additional Information#

Date Initiated2022-11-03
WardWard 6 - Glen Gower

Documents#

TypeDocument
Architectural Plans2024-04-04 - Site Plan - D07-12-22-0157
Architectural Plans2023-04-04 - Site Plan - New Work - D07-12-22-0157
Architectural Plans2023-04-04 - Removal Plan - D07-12-22-0157
Architectural Plans2023-04-04 - Notes & Details - D07-12-22-0157
Architectural Plans2023-04-04 - ELEVATIONS - D07-12-22-0157
Architectural Plans2022-11-03 - Architecture Drawings - D07-12-22-0157
Civil Engineering Report2022-11-03 - Civil Drawings - D07-12-22-0157
Design Brief2022-11-03 - Planning Rationale - Design Brief - D07-12-22-0157
Drainage Plan2024-04-04 - Drainage Area Plan - D07-12-22-0157
Environmental2022-11-03 - Phase I Environmental Site Assessment - D07-12-22-0157
Erosion And Sediment Control Plan2024-04-04 - Erosion & Sediment Control Plan - D07-12-22-0157
Geotechnical Report2023-04-04 - Grading Plan - D07-12-22-0157
Geotechnical Report2022-11-03 - Geotechnical Report - D07-12-22-0157
Noise Study2023-04-04 - Stationary Noise - D07-12-22-0157
Noise Study2023-04-04 - Roadway Traffic Noise - D07-12-22-0157
Noise Study2022-11-03 - Stationary Noise Assessment - D07-12-22-0157
Noise Study2022-11-03 - Roadway Traffic Noise Assessment - D07-12-22-0157
Notification2024-02-05 - Commence Work Notification - D07-12-22-0157
Site Servicing2023-04-04 - Servicing Plan - D07-12-22-0157
Site Servicing2023-04-04 - SERVICING AND STORMWATER MANGEGEMENT REPORT - D07-12-22-0157
Site Servicing2022-11-03 - Servicing and Stormwater Management Report - D07-12-22-0157
Surveying2022-11-03 - Survey Plan - D07-12-22-0157
Transportation Analysis2023-04-04 - Transportation Impact Assessment - D07-12-22-0157
Transportation Analysis2022-11-03 - Transportation Impact Assessment - D07-12-22-0157
Tree Information and Conservation2023-04-04 - Tree Conservation Report & Landscape Plan - D07-12-22-0157
Tree Information and Conservation2022-11-03 - Tree Conservation Report & Landscape Drawing - D07-12-22-0157
2023-04-04 - Site Details - D07-12-22-0157
2023-04-04 - Flow Control Roof Drainage Declaration - D07-12-22-0157
2023-04-04 - Flow Control Declaration - D07-12-22-0157