Summary#

The City of Ottawa has received Zoning By-law Amendment and Site Plan Control applications for a 21-storey, mixed-use building incorporating the City Registry Office, a designated heritage building.

Status
Post Approval (Agreement Registered - Securities Held)
Type
Site Plan Control

Building Scale (Max.) Based on elevation drawings. Values may be approximate. See sources for exact figures.
High-rise · 21 storeys · 69.1 m

Renders#

  • Rendering of building from page 76 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 26 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 78 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 79 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 10 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 62 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 1 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 1 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 48 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 21 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 14 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 18 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 22 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 6 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 17 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 39 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 31 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 3 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 3 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 91 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 62 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 1 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 12 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 20 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 15 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 13 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 13 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 26 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 27 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 13 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 34 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 19 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 35 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 19 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 85 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 87 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 25 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 35 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 80 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 3 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 19 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 16 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 24 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 15 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 19 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 23 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 16 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 26 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 38 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 38 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 25 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 71 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 76 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 26 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 78 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 79 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 10 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 62 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 1 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 1 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 48 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 21 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 14 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 18 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 22 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 6 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 17 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 39 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 31 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 3 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 3 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 91 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 62 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 1 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 12 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 20 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 15 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 13 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 13 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 26 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 27 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 13 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 34 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 19 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 35 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 19 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 85 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 87 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 25 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 35 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 80 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 3 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 19 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 16 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 24 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 15 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 19 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 23 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 16 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 26 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 38 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 38 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Rendering of building from page 25 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Rendering of building from page 71 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'

Location#

Select a marker to view the address.

Project Updates#

2024-09-06 Initial Update
Added description, height, 91 images and 4 documents
  • Status: Post Approval (Agreement Registered - Securities Held)
  • The City of Ottawa has received Zoning By-law Amendment and Site Plan Control applications for a 21-storey, mixed-use building incorporatin…
  • Height: 69.1 m
  • Storeys: 21 storeys
  • 52 renders
  • 19 site plans

Site Plans, Elevations and Floor Plans#

  • Image from page 42 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Image from page 42 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Image from page 44 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Image from page 45 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Image from page 61 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Image from page 46 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Image from page 46 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Image from page 45 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Image from page 14 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Image from page 44 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Image from page 45 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Image from page 45 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Image from page 5 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 33 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 30 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 48 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Construction site plan for project from page 32 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 36 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 36 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Construction site plan for project from page 81 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 41 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 82 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 53 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 37 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 83 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Construction site plan for project from page 32 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 38 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 38 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 35 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 41 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 49 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Construction site plan for project from page 50 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Floor plan for project from page 37 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Floor plan for project from page 35 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Floor plan for project from page 34 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Floor plan for project from page 40 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Floor plan for project from page 39 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Floor plan for project from page 40 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Floor plan for project from page 39 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Image from page 42 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Image from page 42 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Image from page 44 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Image from page 45 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Image from page 61 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Image from page 46 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Image from page 46 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Image from page 45 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Image from page 14 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Image from page 44 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Image from page 45 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Image from page 45 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Image from page 5 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 33 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 30 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 48 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Construction site plan for project from page 32 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 36 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 36 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Construction site plan for project from page 81 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 41 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 82 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 53 of the file '2021-11-16 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 37 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 83 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Construction site plan for project from page 32 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 38 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 38 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 35 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 41 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Construction site plan for project from page 49 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Construction site plan for project from page 50 of the file '2022-03-25 - UDRP Formal Review - D07-12-21-0197'
  • Floor plan for project from page 37 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Floor plan for project from page 35 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Floor plan for project from page 34 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Floor plan for project from page 40 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Floor plan for project from page 39 of the file '2022-05-03 - Design Brief - D07-12-21-0197'
  • Floor plan for project from page 40 of the file '2022-09-09 - Design Brief - D07-12-21-0197'
  • Floor plan for project from page 39 of the file '2022-09-09 - Design Brief - D07-12-21-0197'

Additional Information#

Date Initiated2021-11-16
WardWard 12 - Stéphanie Plante
All Addresses70 Nicholas St.
74 Nicholas St.

Documents#

TypeDocument
Application Summary2021-11-25 - Application Summary - D07-12-21-0197
Architectural Plans2023-05-29 - Approved Site Plan - D07-12-21-0197
Architectural Plans2023-05-29 - Approved Elevations - D07-12-21-0197
Architectural Plans2022-12-13 - Site Plan - D07-12-21-0197
Architectural Plans2022-12-13 - Elevations - D07-12-21-0197
Architectural Plans2022-12-13 - Details Plan - D07-12-21-0197
Architectural Plans2022-12-13 - Capital Illumination Plan - D07-12-21-0197
Architectural Plans2022-09-08 - Architectural Drawing Package - D07-12-21-0197
Civil Engineering Report2022-09-08 - Civil Drawings - D07-12-21-0197
Civil Engineering Report2022-05-03 - Civil Drawings - D07-12-21-0197
Design Brief2022-09-09 - Design Brief - D07-12-21-0197
Design Brief2022-05-03 - Design Brief - D07-12-21-0197
Design Brief2022-03-25 - UDRP Formal Review - D07-12-21-0197
Design Brief2021-11-16 - Design Brief - D07-12-21-0197
Environmental2022-11-02 - Phase II - Environmental Site Assessment - D07-12-21-0197
Environmental2022-09-08 - Environmental Noise Assessment - D07-12-21-0197
Environmental2022-05-03 - Phase I Environmental Site Assessment - D07-12-21-0197
Environmental2021-11-16 - Phase II Environmental Site Assessment - D07-12-21-0197
Environmental2021-11-16 - Phase I Environmental Site Assessment - D07-12-21-0197
Environmental2021-11-16 - Environmental Noise Assessment - D07-12-21-0197
Geotechnical Report2021-11-16 - Geotechnical - D07-12-21-0197
Landscape Plan2023-05-29 - Approved Upper Terraces Landscape Layout - D07-12-21-0197
Landscape Plan2023-05-29 - Approved Level 1 Landscape Plan - D07-12-21-0197
Landscape Plan2023-05-29 - Approved Landscape Details (Ground Level) - D07-12-21-0197
Landscape Plan2022-12-13 - Landscape Plan - D07-12-21-0197
Landscape Plan2022-12-13 - L3 Landscape Study - D07-12-21-0197
Landscape Plan2022-09-08 - Landscape Plans - D07-12-21-0197
Landscape Plan2022-05-03 - Landscape Plan - D07-12-21-0197
Landscape Plan2021-11-16 - Landscape Drawing Set - D07-12-21-0197
Noise Study2022-06-06 - Noise Study Letter - D07-12-21-0197
Planning2021-11-16 - Planning Rationale - D07-12-21-0197
Site Servicing2023-05-29 - Approved Site Servicing, Grading, Erosion and Sediment Control Plan - D07-12-21-0197
Site Servicing2022-12-13 - Site Servicing, Grading & Erosion & Sediment Control Plan - D07-12-21-0197
Site Servicing2022-12-13 - Rideau Site Servicing and Stormwater Report - D07-12-21-0197
Site Servicing2022-09-08 - Site Servicing & SWM Report - D07-12-21-0197
Site Servicing2022-05-03 - Site Servicing and Stormwater Report - D07-12-21-0197
Site Servicing2021-11-16 - Site Servicing and Stormwater Report - D07-12-21-0197
Surveying2021-11-16 - Topographic - D07-12-21-0197
Transportation Analysis2022-09-08 - Transportation Impact Assessment - D07-12-21-0197
Transportation Analysis2022-03-05 - Transportation Impact Assessment Report - D07-12-21-0197
Transportation Analysis2021-11-16 - Transportation Impact Assessment - D07-12-21-0197
Tree Information and Conservation2021-11-16 - Tree Information Report - D07-12-21-0197
Wind Study2021-11-16 - Wind Study - D07-12-21-0197
2023-05-29 - Signed Delegated Authority Report - D07-12-21-0197
2023-05-29 - Road Modifications Approval (RMA) Report - D07-12-21-0197
2023-05-29 - Approved Watermain Details and Sewer Tables - D07-12-21-0197
2023-05-29 - Approved Details - D07-12-21-0197
2022-12-13 - Watermain Details & Sewer Tables - D07-12-21-0197
2022-05-03 - Drawing Package - D07-12-21-0197
2022-05-03 - Addendum Letter - D07-12-21-0197
2021-11-16 - Watermain Details - D07-12-21-0197
2021-11-16 - Engineering - D07-12-21-0197
2021-11-16 - Drawing Package - D07-12-21-0197
2021-11-16 - Details - D07-12-21-0197
2021-11-16 - City Registry Office - D07-12-21-0197