930 Carling / 520 Preston#
Summary#
The development proposed are Phase 3 and Phase 4 of The Ottawa Hospital Master Site Plan: Phase 3 is the CUP (Central Utility Plant containing electrical, heating, and cooling equipment, located at the rear of the hospital - Phase 4 is the hospital main building consists of 2-storey podium, two towers (8-12 storey) and pavilion flanking main entrance)
Status
Inactive (Zoning By-law in Effect)
Building Scale (Max.)
Based on elevation drawings. Values may be approximate. See sources for exact figures.
Low-rise · 1 storey
Data Quality Note
Text was extracted using optical character recognition. This may introduce artifacts or misreads.
· 7.3 m
Data Quality Note
Height was partially estimated using visual scale. This may be approximate.
Data Quality Note
Text was extracted using optical character recognition. This may introduce artifacts or misreads.
Project Updates#
- Status: Inactive (Zoning By-law in Effect)
- Updated description:The development proposed are Phase 3 and Phase 4 of The Ottawa Hospital Master Site Plan: Phase 3 is the CUP (Central Utility Plant contain…
- Status: Post Approval (Agreement sent to applicant)
- A Site Plan Control application to construct one free-standing multi-tenant building (675.3 sqm GFA), a multi-tenant building expansion con…
- Height: 7.3 m
- Storeys: 1 storey
Additional Information#
| Date Initiated | 2022-12-09 |