Ottawa Development Projects

3400-3428 Woodroffe Ave.#

Last updated: 2026-05-15 · ID: D02-02-25-0090

Summary#

A Zoning By-law Amendment and Site Plan Control application to rezone the site to Residential Fourth Density, Subzone Z, with an exception (R4Z[XXXX]) to construct a planned unit development (PUD). The proposal consists of a private road and 16 buildings ranging from 2 to 3 storeys, for a total of 160 units.

Status
Active (Comment Period in Progress)
Type
Zoning By-law Amendment

Building Scale (Max.) Based on elevation drawings. Values may be approximate. See sources for exact figures.
Low-rise · 2 storeys · 5.5 m Data Quality Note Height was partially estimated using visual scale. This may be approximate.

Renders#

Location#

Select a marker to view the address.

Project Updates#

2026-01-30 Summary
Added description
  • Updated description: A Zoning By-law Amendment and Site Plan Control application to rezone the site to Residential Fourth Density, Subzone Z, with an exception …
2026-01-21 Status
Status Updated
  • Status: Active (Comment Period in Progress)
2026-01-20 Documents
Added 1 document
2026-01-16 Initial Update
Added description, height, 7 images and 2 documents
  • Status: Active (Community Heads Up - supporting documents to be posted later during circulation period)
  • NEW RESIDENTIAL DEVELOPMENT WITH A MIX OF UNITS INCLUDING YOWNHOMES, BACK TO BACK TOWNHOMES, STACKED TOWNHOMES FOR A TOTAL OF 160 UNITS ON …
  • Height: 5.5 m
  • Storeys: 2 storeys
  • 2 renders
  • 2 site plans

Site Plans, Elevations and Floor Plans#

Additional Information#

Date Initiated2025-12-03
WardWard 24 - Wilson Lo
All Addresses3400 Woodroffe Ave.
3428 Woodroffe Ave.

Documents#

TypeDocument
Application Summary2026-01-19 - Application Summary - D02-02-25-0090
Architectural Plans2025-12-04 - Site Plan - D02-02-25-0090
Architectural Plans2025-12-04 - Preliminary Construction Management Plan - D02-02-25-0090
Architectural Plans2025-12-04 - Architectural Plans - Stacked Back-to-Back Townhouses (Terra Flats) - D02-02-25-0090
Architectural Plans2025-12-04 - Architectural Plans - 3 Storey - Back to Back - D02-02-25-0090
Architectural Plans2025-12-04 - Architectural Plans - 2-storey towns - D02-02-25-0090
Architectural Plans2026-05-14 - Site Plan - D07-12-25-0158 & D02-02-25-0090
Design Brief2025-12-04 - Urban Design Brief - D02-02-25-0090
Design Brief2026-01-26 - Urban Design Brief - D02-02-25-0090
Erosion And Sediment Control Plan2025-12-04 - Site Removal, Erosion and Sediment Control Plan - D02-02-25-0090
Erosion And Sediment Control Plan2026-05-14 - Site Removals, Erosion and Sediment Control Plan - D07-12-25-0158 & D02-02-25-0090
Geotechnical Report2025-12-04 - Grading Plan - D02-02-25-0090
Geotechnical Report2025-12-04 - Geotechnical Investigation - D02-02-25-0090
Geotechnical Report2026-05-14 - Grading Plan - D07-12-25-0158 & D02-02-25-0090
Geotechnical Report2026-05-14 - Geotechnical Investigation Rev 1 - D07-12-25-0158 & D02-02-25-0090
Landscape Plan2025-12-04 - Landscape Plan - D02-02-25-0090
Landscape Plan2026-05-14 - Landscape Plan - D07-12-25-0158 & D02-02-25-0090
Noise Study2025-12-04 - Noise Impact Assessment - D02-02-25-0090
Noise Study2026-05-14 - Noise Impact Assessment - D07-12-25-0158 & D02-02-25-0090
Planning2025-12-04 - Zoning Confirmation Report - D02-02-25-0090
Planning2025-12-04 - Planning Rationale - D02-02-25-0090
Rendering2025-12-04 - Terra Flats Rendering - D02-02-25-0090
Rendering2025-12-04 - B2B Townhome Rendering - D02-02-25-0090
Site Servicing2025-12-04 - Servicing Plan - D02-02-25-0090
Site Servicing2025-12-04 - Servicing Design Brief - D02-02-25-0090
Site Servicing2026-05-14 - Servicing Plan - D07-12-25-0158 & D02-02-25-0090
Site Servicing2026-05-14 - Servicing Design Brief - D07-12-25-0158 & D02-02-25-0090
Stormwater Management2025-12-04 - Storm Drainage Area Plan - D02-02-25-0090
Stormwater Management2025-12-04 - Pre-Development Storm Drainage Area Plan - D02-02-25-0090
Stormwater Management2026-05-14 - Pre-Development Storm Drainage Area Plan - D07-12-25-0158 & D02-02-25-0090
Stormwater Management2026-05-14 - Post-Development Storm Drainage Area Plan - D07-12-25-0158 & D02-02-25-0090
Stormwater Management2026-05-14 - Off-Site Storm Drainage Area Plan - D07-12-25-0158 & D02-02-25-0090
Surveying2025-12-04 - Survey - Plan 4R-37128 - D02-02-25-0090
Transportation Analysis2025-12-04 - Transportation Impact Assessment - D02-02-25-0090
Transportation Analysis2026-05-14 - Transportation Impact Assessment - D07-12-25-0158 & D02-02-25-0090
Tree Information and Conservation2025-12-04 - Trees Sketch - D02-02-25-0090
Tree Information and Conservation2025-12-04 - Tree Conservation Plan - D02-02-25-0090
Tree Information and Conservation2026-05-14 - Tree Conservation Plan Rev 3 - D07-12-25-0158 & D02-02-25-0090
2025-12-04 - TOWN HOME - ASTOR MODEL - D02-02-25-0090
2025-12-04 - TOWN HOME - ALZEN MODEL - D02-02-25-0090
2025-12-04 - RMA Package - D02-02-25-0090
2025-12-04 - Notes and Tables - D02-02-25-0090
2025-12-04 - 3 Storey - Back to Back - D02-02-25-0090
2026-05-14 - Notes and Tables - D07-12-25-0158 & D02-02-25-0090