Ottawa Development Projects

314 Bell St.#

Last updated: 2023-10-11 · ID: D02-02-22-0103

Summary#

The proposal is to permit a height allowance of 11.95m, to allow a porch and steps to project 0.15m from the south lot line, and for a canopy to project 0.10m from the south lot line.

Status
Inactive (Zoning By-law in Effect)

Building Scale (Max.) Based on elevation drawings. Values may be approximate. See sources for exact figures.
Low-rise · 2 storeys Data Quality Note Text was extracted using optical character recognition. This may introduce artifacts or misreads. · 6.5 m Data Quality Note Height was partially estimated using visual scale. This may be approximate. Data Quality Note Text was extracted using optical character recognition. This may introduce artifacts or misreads.

Location#

Select a marker to view the address.

Additional Information#

Date Initiated2022-11-04
WardWard 17 - Shawn Menard

Documents#

TypeDocument
Adequacy Of Public Services2022-11-04 - Serviceability Report - D02-02-22-0103
Application Summary2023-04-04 - Application Summary - D02-02-22-0103
Architectural Plans2023-06-26 - Architectural Package - D02-02-22-0103
Architectural Plans2022-11-04 - Site Plan & Architectural Drawings - D02-02-22-0103
Architectural Plans2022-11-04 - Site Grading Plan - D02-02-22-0103
Electrical Plan2022-11-04 - Site Lighting - D02-02-22-0103
Electrical Plan2022-11-04 - Lighting Certification letter - D02-02-22-0103
Environmental2022-11-04 - Phase II Environmental Site Assessment - D02-02-22-0103
Environmental2022-11-04 - Phase I Environmental Site Assessment - D02-02-22-0103
Erosion And Sediment Control Plan2022-11-04 - Erosion & Sediment Control Plan - D02-02-22-0103
Geotechnical Report2022-11-04 - Geotechnical Investigation - D02-02-22-0103
Landscape Plan2022-11-04 - Landscape Plan - D02-02-22-0103
Noise Study2022-11-04 - Noise Attenuation Study - D02-02-22-0103
Planning2022-11-04 - Planning Rationale - D02-02-22-0103
Stormwater Management2022-11-04 - Storm Drainage Report - D02-02-22-0103
Stormwater Management2022-11-04 - Storm Drainage Plan - D02-02-22-0103
Stormwater Management2022-11-04 - Rooftop Stormwater Management Plan - D02-02-22-0103
Surveying2022-11-04 - Topographical Plan - D02-02-22-0103
What is a Zoning By-Law Amendment - French3
What is a Zoning By-Law Amendment - English4
2022-11-04 - Memo - Foundation Drainage Details - D02-02-22-0103