Ottawa Development Projects

Thumbnail

15-17 Oblats

Last updated: 2023-11-09 · ID: D02-02-22-0083

Summary#

The proposal requests a zoning amendment to consolidate two zones, reduce interior side yard setbacks to 0.03 to 4.19 metres, and decrease required vehicle parking to 20 spaces. This amendment also seeks to increase building height to permit five storeys (18 metres) along Springhurst Ave and allows for a zero-metre buffer between a parking lot and the street.

Source: City-provided description
Status
Inactive (OMB Appeal Withdrawn - Application Approved)
Property Type
Variance / Relaxation

Building Scale (Max.) Derived from project description and planning application details. Values may be approximate.
Mid-rise · 5 storeys · 18 m

Renders#

Location#

Select a marker to view the address.

Project Updates#

2023-11-09 Initial Update
Added description, height, 16 images and 33 documents
  • Status: Inactive (OMB Appeal Withdrawn - Application Approved)
  • The proposal requests a zoning amendment to consolidate two zones, reduce interior side yard setbacks to 0.03 to 4.19 metres, and decrease …
  • Height: 5 storeys, 18 m
  • 4 renders
  • 8 site plans
  • 4 elevations

Site Plans, Elevations and Floor Plans#

Additional Information#

Date Initiated2022-08-23
WardWard 17 - Shawn Menard
All Addresses15 Oblats
17 Oblats

Documents#

TypeDocument
Application Summary2022-09-21 - Application Summary - D02-02-22-0083 & D07-12-22-0124
Architectural Plans2022-08-23 - Conservation Plan - D02-02-22-0083
Architectural Plans2022-08-23 - Floor & Elevation Drawings - D02-02-22-0083
Architectural Plans2022-08-23 - Site plan - D02-02-22-0083
Architectural Plans2023-03-30 - Elevations - D02-02-22-0083
Architectural Plans2023-03-30 - Removal Plan - D02-02-22-0083
Architectural Plans2023-03-30 - Site Plan - D02-02-22-0083
Civil Engineering Report2022-08-23 - Civil Plans - D02-02-22-0083
Design Brief2022-08-23 - Planning Rationale & Design Brief - D02-02-22-0083
Environmental2022-08-23 - Phase 1 Environmental Site Assessment - D02-02-22-0083
Environmental2022-08-23 - Phase Two Environmental Site Assessment - D02-02-22-0083
Erosion And Sediment Control Plan2023-03-30 - Erosion and Sediment Control - D02-02-22-0083
Floor Plan2023-03-30 - Floor Plans - D02-02-22-0083
Geotechnical Report2022-08-23 - Geotechnical Investigation Report - D02-02-22-0083
Geotechnical Report2023-03-30 - Geotechnical Investigation - D02-02-22-0083
Geotechnical Report2023-03-30 - Grading Plan - D02-02-22-0083
Landscape Plan2022-08-23 - Landscape Plan - D02-02-22-0083
Noise Study2022-08-23 - Traffic Noise - D02-02-22-0083
Noise Study2023-03-30 - Roadway Traffic Noise Addendum Letter - D02-02-22-0083
Planning2023-03-30 - Planning Rationale - D02-02-22-0083
Planning2023-03-30 - Planning Rationale Addendum - D02-02-22-0083
Shadow Study2023-03-30 - Shadow Study - D02-02-22-0083
Site Servicing2022-08-23 - Site Servicing Report - D02-02-22-0083
Site Servicing2023-03-30 - Grading & Servicing Plan Review Memo -D02-02-22-0083
Site Servicing2023-03-30 - Servicing Plan - D02-02-22-0083
Site Servicing2023-03-30 - Site Servicing Report - D02-02-22-0083
Stormwater Management2022-08-23 - Stormwater Management Report - D02-02-22-0083
Stormwater Management2023-03-30 - Stormwater Management Report - D02-02-22-0083
Surveying2022-08-23 - Topographical Plan of Survey - D02-02-22-0083
Transportation Analysis2022-08-23 - Transportation Impact Assessment - D02-02-22-0083
Transportation Analysis2023-03-30 - Transportation Impact Assessment - D02-02-22-0083
Tree Information and Conservation2023-03-30 - Tree Conservation Report & Landscape Plan - D02-02-22-0083
2023-03-30 - Unit Mix Analysis - D02-02-22-0083