Ottawa Development Projects

505 Chaudiere#

Last updated: 2022-06-22 · ID: D02-02-22-0040

Summary#

The City of Ottawa has received Zoning By-law Amendment and Site Plan Control applications to permit the development of a 23-storey mixed-use building, including an increase to the maximum permitted floorplate area for the 10th storey.

Status
File Pending (Application File Pending)

Building Scale (Max.) Based on elevation drawings. Values may be approximate. See sources for exact figures.
High-rise · 22 storeys · 75.69 m

Renders#

  • Rendering of building from page 1 of the file '2022-04-27 - Project Perspectives - D02-02-22-0040'
  • Rendering of building from page 3 of the file '2022-12-30 - Axonometric Views and Project Perspectives - D02-02-22-0040'
  • Rendering of building from page 3 of the file '2022-12-30 - Axonometric Views and Project Perspectives - D02-02-22-0040'
  • Rendering of building from page 30 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 1 of the file '2022-04-27 - Project Perspectives - D02-02-22-0040'
  • Rendering of building from page 19 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 31 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 16 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 54 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 53 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 17 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 47 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 48 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 16 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 5 of the file '2022-04-27 - Views Study - D02-02-22-0040'
  • Rendering of building from page 54 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 31 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 19 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 30 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 18 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 53 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 3 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 52 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 6 of the file '2022-04-27 - Views Study - D02-02-22-0040'
  • Rendering of building from page 12 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 3 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 7 of the file '2022-04-27 - Views Study - D02-02-22-0040'
  • Rendering of building from page 4 of the file '2022-04-27 - Views Study - D02-02-22-0040'
  • Rendering of building from page 7 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 7 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 7 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 1 of the file '2022-04-27 - Project Perspectives - D02-02-22-0040'
  • Rendering of building from page 3 of the file '2022-12-30 - Axonometric Views and Project Perspectives - D02-02-22-0040'
  • Rendering of building from page 3 of the file '2022-12-30 - Axonometric Views and Project Perspectives - D02-02-22-0040'
  • Rendering of building from page 30 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 1 of the file '2022-04-27 - Project Perspectives - D02-02-22-0040'
  • Rendering of building from page 19 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 31 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 16 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 54 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 53 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 17 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 47 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 48 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 16 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 5 of the file '2022-04-27 - Views Study - D02-02-22-0040'
  • Rendering of building from page 54 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 31 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 19 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 30 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 18 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 53 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 3 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 52 of the file '2022-04-27 - Architectural Design Brief - D02-02-22-0040'
  • Rendering of building from page 6 of the file '2022-04-27 - Views Study - D02-02-22-0040'
  • Rendering of building from page 12 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 3 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 7 of the file '2022-04-27 - Views Study - D02-02-22-0040'
  • Rendering of building from page 4 of the file '2022-04-27 - Views Study - D02-02-22-0040'
  • Rendering of building from page 7 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 7 of the file '2022-10-03 - Design Brief - D02-02-22-0040'
  • Rendering of building from page 7 of the file '2022-10-03 - Design Brief - D02-02-22-0040'

Site Plans, Elevations and Floor Plans#

Additional Information#

Date Initiated2022-04-27
WardWard 14 - Ariel Troster

Documents#

TypeDocument
Architectural Plans2023-03-04 - Architectural Plans - D02-02-22-0040
Architectural Plans2022-12-30 - Site Plans - D02-02-22-0040
Architectural Plans2022-12-30 - Overall Plan - Mechanical Penthouse - D02-02-22-0040
Architectural Plans2022-12-30 - Elevations - D02-02-22-0040
Architectural Plans2022-10-03 - Site Plan - D02-02-22-0040
Architectural Plans2022-10-03 - Sediment and Erosion Control Plan - D02-02-22-0040
Architectural Plans2022-10-03 - Plans and Profile - Miwate Private - D02-02-22-0040
Architectural Plans2022-10-03 - Plans and Profile - D02-02-22-0040
Architectural Plans2022-10-03 - Notes Plan - D02-02-22-0040
Architectural Plans2022-10-03 - Master Plan Ontario Lands - D02-02-22-0040
Architectural Plans2022-10-03 - Elevation-West - D02-02-22-0040
Architectural Plans2022-10-03 - Elevation-South - D02-02-22-0040
Architectural Plans2022-10-03 - Elevation-North - D02-02-22-0040
Architectural Plans2022-10-03 - Elevation-East - D02-02-22-0040
Architectural Plans2022-10-03 - Context Site Plan - D02-02-22-0040
Architectural Plans2022-04-27 - Site Plan - D02-02-22-0040
Architectural Plans2022-04-27 - Sediment and Erosion Control Plan - D02-02-22-0040
Architectural Plans2022-04-27 - Plans and Profile (2) - D02-02-22-0040
Architectural Plans2022-04-27 - Plans and Profile - D02-02-22-0040
Architectural Plans2022-04-27 - Notes Plan - D02-02-22-0040
Architectural Plans2022-04-27 - Elevation West - D02-02-22-0040
Architectural Plans2022-04-27 - Elevation South - D02-02-22-0040
Architectural Plans2022-04-27 - Elevation North - D02-02-22-0040
Architectural Plans2022-04-27 - Elevation East - D02-02-22-0040
Architectural Plans2022-04-27 - Context Site Plan - D02-02-22-0040
Architectural Plans2022-04-27 - Architectural Cover Sheet - D02-02-22-0040
Civil Engineering Report2023-03-07 - Civil Plans - D02-02-22-0040
Civil Engineering Report2022-12-30 - Civil Plans - D02-02-22-0040
Cover Letter2022-10-03 - Cover Sheet - D02-02-22-0040
Design Brief2022-10-03 - Design Brief - D02-02-22-0040
Design Brief2022-04-27 - Architectural Design Brief - D02-02-22-0040
Electrical Plan2022-04-27 - Lighting Compliance Letter - D02-02-22-0040
Environmental2022-04-27 - Phase Two Environmental Site Assessment - D02-02-22-0040
Environmental2022-04-27 - Phase One Environmental Site Assessment - D02-02-22-0040
Environmental2022-04-27 - Phase II Environmental Site Assessment - D02-02-22-0040
Environmental2022-04-27 - Phase I Environmental Site Assessment - D02-02-22-0040
Environmental2022-04-27 - Environmental Noise Assessment - D02-02-22-0040
Floor Plan2022-12-30 - Overall Floor Plans - D02-02-22-0040
Floor Plan2022-10-03 - Floor Plan-P1 - D02-02-22-0040
Floor Plan2022-10-03 - Floor Plan-Mezzanine - D02-02-22-0040
Floor Plan2022-10-03 - Floor Plan-Mechanical Penthouse - D02-02-22-0040
Floor Plan2022-10-03 - Floor Plan-Level 9 - D02-02-22-0040
Floor Plan2022-10-03 - Floor Plan-Level 6 - D02-02-22-0040
Floor Plan2022-10-03 - Floor Plan-Level 3 - D02-02-22-0040
Floor Plan2022-10-03 - Floor Plan-Level 2 - D02-02-22-0040
Floor Plan2022-10-03 - Floor Plan-Level 11 - D02-02-22-0040
Floor Plan2022-10-03 - Floor Plan-Level 10 - D02-02-22-0040
Floor Plan2022-10-03 - Floor Plan Level 1-Ground - D02-02-22-0040
Floor Plan2022-04-27 - Floor Plan-Mezzanine - D02-02-22-0040
Floor Plan2022-04-27 - Floor Plan-Level 4 - D02-02-22-0040
Floor Plan2022-04-27 - Floor Plan-Level 3 - D02-02-22-0040
Floor Plan2022-04-27 - Floor Plan-Level 2 - D02-02-22-0040
Floor Plan2022-04-27 - Floor Plan-Level 11 - D02-02-22-0040
Floor Plan2022-04-27 - Floor Plan-Level 10 - D02-02-22-0040
Floor Plan2022-04-27 - Floor Plan-Level 1-Ground - D02-02-22-0040
Floor Plan2022-04-27 - Floor Plan Parking 1 - D02-02-22-0040
Floor Plan2022-04-27 - Floor Plan Mechanical Penthouse - D02-02-22-0040
Floor Plan2022-04-27 - Floor Plan Level 12 - D02-02-22-0040
Geotechnical Report2023-03-17 - Geotechnical Investigation Rev 3 - D02-02-22-0040
Geotechnical Report2022-12-30 - Geotechnical Investigation Rev 3 - D02-02-22-0040
Geotechnical Report2022-10-03 - Geotechnical Investigation - Block 201 to 205B - D02-02-22-0040
Geotechnical Report2022-04-27 - Geotechnical Investigation - D02-02-22-0040
Landscape Plan2023-03-07 - Landscape Plans and Details - D02-02-22-0040
Landscape Plan2022-12-30 - Landscape Plans - Ground Floor - D02-02-22-0040
Landscape Plan2022-12-30 - Landscape Plan - Second & Ninth Floor Amenity - D02-02-22-0040
Landscape Plan2022-12-30 - Landscape Plan - Interim Condition - D02-02-22-0040
Landscape Plan2022-12-30 - Landscape Details - D02-02-22-0040
Landscape Plan2022-10-03 - Landscape Plan-Tenth Level - D02-02-22-0040
Landscape Plan2022-10-03 - Landscape Plan-Second Level - D02-02-22-0040
Landscape Plan2022-10-03 - Landscape Plan-Interim Condition - D02-02-22-0040
Landscape Plan2022-10-03 - Landscape Plan-Ground Floor - D02-02-22-0040 (2)
Landscape Plan2022-10-03 - Landscape Plan-Ground Floor - D02-02-22-0040
Landscape Plan2022-10-03 - Landscape Details - D02-02-22-0040 (3)
Landscape Plan2022-10-03 - Landscape Details - D02-02-22-0040 (2)
Landscape Plan2022-10-03 - Landscape Details - D02-02-22-0040
Landscape Plan2022-04-27 - Landscape Plan-Tenth Level - D02-02-22-0040
Landscape Plan2022-04-27 - Landscape Plan-Second Level - D02-02-22-0040
Landscape Plan2022-04-27 - Landscape Plan-Interim Control - D02-02-22-0040
Landscape Plan2022-04-27 - Landscape Plan-Ground Floor (2) - D02-02-22-0040
Landscape Plan2022-04-27 - Landscape Plan-Ground Floor - D02-02-22-0040
Landscape Plan2022-04-27 - Landscape Details (3) - D02-02-22-0040
Landscape Plan2022-04-27 - Landscape Details (2) - D02-02-22-0040
Landscape Plan2022-04-27 - Landscape Details - D02-02-22-0040
Noise Study2022-10-03 - Noise Report - D02-02-22-0040
Planning2022-04-27 - Planning Rationale - D02-02-22-0040
Rendering2022-12-30 - Axonometric Views and Project Perspectives - D02-02-22-0040
Rendering2022-10-03 - Project Perspectives - D02-02-22-0040
Rendering2022-10-03 - Axonometric Views - D02-02-22-0040 (2)
Rendering2022-10-03 - Axonometric Views - D02-02-22-0040
Rendering2022-04-27 - Views Study - D02-02-22-0040
Rendering2022-04-27 - Project Perspectives - D02-02-22-0040
Rendering2022-04-27 - Axonometric Views (2) - D02-02-22-0040
Rendering2022-04-27 - Axonometric Views - D02-02-22-0040
Shadow Study2022-10-03 - Shadow Study - D02-02-22-0040
Shadow Study2022-04-27 - Shadow Study - D02-02-22-0040
Site Servicing2023-03-17 - Site Servicing Report Rev 2 - D02-02-22-0040
Site Servicing2022-12-30 - Site Servicing Report Rev 2 - D02-02-22-0040
Site Servicing2022-10-03 - Site Servicing Report - D02-02-22-0040
Site Servicing2022-10-03 - Site Servicing Plan-D02-02-22-0040
Site Servicing2022-04-27 - Site Servicing Report - D02-02-22-0040
Site Servicing2022-04-27 - Site Servicing Plan-Ultimate - D02-02-22-0040
Site Servicing2022-04-27 - Site Servicing Plan-Interim - D02-02-22-0040
Stormwater Management2022-10-03 - Stormwater Management Plan - D02-02-22-0040
Stormwater Management2022-04-27 - Stormwater Management Plan - D02-02-22-0040
Surveying2022-10-03 - Topographical Survey Plan - D02-02-22-0040
Surveying2022-04-27 - Topographical Survey Plan - D02-02-22-0040
Surveying2022-04-27 - Plan of Survey - D02-02-22-0040
Transportation Analysis2022-10-03 - Transportation Addendum Letter - D02-02-22-0040
Wind Study2022-04-27 - Pedestrian Level Wind Study - D02-02-22-0040
2023-03-04 - Appendices - D02-02-22-0040
2022-12-30 - Bird Friendly Design - D02-02-22-0040
2022-10-03 - North-South Section - D02-02-22-0040
2022-10-03 - Letter re Sprinkler for Inclusion in CIMA Site Servicing Report - D02-02-22-0040
2022-10-03 - Hydrogeogy Report - D02-02-22-0040
2022-10-03 - Grade Control and Drainage-D02-02-22-0040
2022-10-03 - East-West Section - D02-02-22-0040
2022-10-03 - Cross-Sections - D02-02-22-0040
2022-10-03 - Cover Page - D02-02-22-0040
2022-04-27 - Technical Memorandum - D02-02-22-0040
2022-04-27 - North-South Section - D02-02-22-0040
2022-04-27 - Letter Wildlife Program - D02-02-22-0040
2022-04-27 - Grade Control and Drainage-Ultimate - D02-02-22-0040
2022-04-27 - Grade Control and Drainage-Interim - D02-02-22-0040
2022-04-27 - East West Section - D02-02-22-0040
2022-04-27 - Cross Sections - D02-02-22-0040
2022-04-27 - Cover Page - D02-02-22-0040