Ottawa Development Projects

100 Weeping Willow Ln.#

Last updated: 2024-05-15 · ID: D02-02-21-0121

Summary#

The requested zoning by-law amendments seek to increasing the allowable unit count from a maximum 85 units permitted (and existing) at the site to accommodate the proposed 142 units, and increasing the building height from the permitted 30 metres to a proposed 32 metres.

Status
Inactive (Zoning By-law in Effect)

Building Scale (Max.) Based on elevation drawings. Values may be approximate. See sources for exact figures.
High-rise · 10 storeys Data Quality Note Text was extracted using optical character recognition. This may introduce artifacts or misreads. · 30.9 m Data Quality Note Height was partially estimated using visual scale. This may be approximate. Data Quality Note Text was extracted using optical character recognition. This may introduce artifacts or misreads.

Renders#

Location#

Select a marker to view the address.

Site Plans, Elevations and Floor Plans#

Additional Information#

Date Initiated2021-10-13
WardWard 4 - Cathy Curry

Documents#

TypeDocument
Adequacy Of Public Services2023-09-01 - Adequacy of Services Report - D02-02-21-0121
Adequacy Of Public Services2023-04-27 - Adequacy of Service Report - D02-02-21-0121
Adequacy Of Public Services2021-10-13 - Adequacy of Services Report - D02-02-21-0121
Application Summary2021-10-21 - Application Summary - D02-02-21-0121
Architectural Plans2023-12-14 - Site Plan - D02-02-21-0121
Architectural Plans2023-12-04- Site Servicing Plan - D02-02-21-0121
Architectural Plans2023-09-01 - Site Plan - D02-02-21-0121
Architectural Plans2023-09-01 - Functional Site Servicing Plan - D02-02-21-0121
Architectural Plans2023-09-01 - Functional Grading Plan - D02-02-21-0121
Architectural Plans2023-09-01 - Functional Erosion Control Plan - D02-02-21-0121
Architectural Plans2023-09-01 - Elevations - D02-02-21-0121
Architectural Plans2023-04-27 - Sanitary Drainage Plan - D02-02-21-0121
Architectural Plans2023-04-27 - architectural package - D02-02-21-0121
Architectural Plans2023-04-26 - conceptual landscape plan
Architectural Plans2021-10-13 - Sanitary Drainage Plan - D02-02-21-0121
Architectural Plans2021-10-13 - Architectural Package - D02-02-21-0121
Environmental2021-10-13 - Phase I Environmental Site Assessment - D02-02-21-0121
Environmental2021-10-13 - Environmental Impact Statement - D02-02-21-0121
Erosion And Sediment Control Plan2023-12-04 - Erosion Control Plan - D02-02-21-0121
Erosion And Sediment Control Plan2023-05-02 - Erosion Control Plan - D02-02-21-0121
Erosion And Sediment Control Plan2023-05-02 - Erosion Control Plan - D02-02-21-0121
Erosion And Sediment Control Plan2021-10-13 - Erosion Control Plan - D02-02-21-0121
Existing Conditions2023-04-27 - Existing Storm Drainage Plan - D02-02-21-0121
Existing Conditions2021-10-13 - Existing Storm Drainage Plan - D02-02-21-0121
Floor Plan2023-12-04 - GROUND FLOOR PLAN - D02-02-21-0121
Floor Plan2023-12-04 - FLOOR PLANS - D02-02-21-0121 (2)
Floor Plan2023-12-04 - FLOOR PLANS - D02-02-21-0121
Floor Plan2023-09-01 - Floor Plans - D02-02-21-0121
Geotechnical Report2023-12-04 - Grading Plan - D02-02-21-0121
Geotechnical Report2023-12-04 - Geotechnical Investigation - D02-02-21-0121
Geotechnical Report2023-09-01 - Geotechnical Investigation - D02-02-21-0121
Geotechnical Report2023-05-02 - Grading Plan - D02-02-21-0121
Geotechnical Report2021-10-13 - Geotechnical - D02-02-21-0121
Geotechnical Report2021–10-13 - Grading Plan - D02-02-21-0121
Landscape Plan2023-12-04 - Landscape Plan and Sections - D02-02-21-0121
Landscape Plan2023-09-01 - Landscape Plan and Sections - D02-02-21-0121
Noise Study2021-10-13 - Noise - D02-02-21-0121
Planning2023-09-01 - Zoning Schedule - D02-02-21-0121
Planning2023-09-01 - Zoning Map - D02-02-21-0121
Planning2023-05-02 - Planning Letter - D02-02-21-0121
Planning2021-10-13 - Planning Rationale - D02-02-21-0120
Rendering2023-09-01 - Perspectives - D02-02-21-0121
Site Servicing2023-04-27 - Site Servicing Plan - D02-02-21-0121
Site Servicing2021-10-13 - Site Servicing Plan - D02-02-21-0121
Stormwater Management2023-04-27 - Storm Drainage Plan - D02-02-21-0121
Stormwater Management2021-10-13 - Storm Drainage Plan - D02-02-21-0121
Surveying2021-10-13 - Topographic - D02-02-21-0121
Transportation Analysis2023-09-01 - Traffic Impact Assessment - D02-02-21-0121
Transportation Analysis2023-05-02 - Traffic Impact Assessment Report - D02-02-21-0121
Transportation Analysis2021-10–13 - Transportation Impact Assessment - D02-02-21-0121
Tree Information and Conservation2023-09-01 - Tree Conservation Report - D02-02-21-0121
Tree Information and Conservation2021-10-13 - Tree Conservation Report - D02-02-21-0121
2023-09-01 - Street Sections - D02-02-21-0121
2023-09-01 - Memo-Geotechnical Response to City Comment - D02-02-21-0121