Ottawa Development Projects

257-277 King Edward Ave./260 Murray St.#

Last updated: 2023-09-15 · ID: D02-02-21-0085

Summary#

The proposed zoning amendment will rezone the entire property to traditional maninstreet with a site-specific schedule to provide detailed height, setback and step-back requirements to control the building mass and articulation. For additional information please refer to the Planning Rationale.

Status
Inactive (OMB Appeal Withdrawn - Application Approved)

Building Scale (Max.) Based on elevation drawings. Values may be approximate. See sources for exact figures.
Mid-rise · 8 storeys · 25.1 m

Renders#

Location#

Select a marker to view the address.

Site Plans, Elevations and Floor Plans#

Additional Information#

Date Initiated2021-08-23
WardWard 12 - Stéphanie Plante
All Addresses257 King Edward Ave.
261 King Edward Ave.
269 King Edward Ave.
275 King Edward Ave.
277 King Edward Ave.
260 Murray St.

Documents#

TypeDocument
Application Summary2021-09-08 - Application Summary - D02-02-21-0085
Architectural Plans2022-05-02 - Site Plan - D02-02-21-0085
Architectural Plans2022-05-02 - Roof Plan - D02-02-21-0085
Architectural Plans2022-05-02 - Elevations - D02-02-21-0085
Architectural Plans2022-04-06 - Site Plan - D02-02-21-00851
Architectural Plans2022-04-06 - Site Plan - D02-02-21-0085
Architectural Plans2022-04-06 - Elevations - D02-02-21-0085
Architectural Plans2022-01-20 - Site Plan - D02-02-21-0085
Architectural Plans2022-01-20 - Plans Garage Levels - D02-02-21-0085
Architectural Plans2022-01-20 - Ground Level Plan - D02-02-21-0085
Architectural Plans2022-01-20 - Elevations - D02-02-21-0085
Architectural Plans2021-09-08 - Elevations - D02-02-21-0085
Architectural Plans2021-08-23 - Site Plan - D02-02-21-0085
Architectural Plans2021-08-23 - Roof Plan - D02-02-21-0085
Architectural Plans2021-08-23 - Garage Plan - D02-02-21-0085
Civil Engineering Report2022-04-06 - Civil Plans - D02-02-21-0085
Civil Engineering Report2022-01-20 - Civil Plans - D02-02-21-0085
Design Brief2021-08-23 - Design Brief - D02-02-21-0085
Environmental2021-08-23 - Phase I Environmental Site Assessment - D02-02-21-0085
Floor Plan2022-04-06 - Garage Floor Plans - D02-02-21-0085
Geotechnical Report2021-08-23 - Geotechnical - D02-02-21-0085
Landscape Plan2022-04-06 - Landscape Plan - D02-02-21-0085
Landscape Plan2022-01-20 - Landscape - D02-02-21-0085
Landscape Plan2021-08-23 - Landscape Plan - D02-02-21-0085
Noise Study2021-08-23 - Roadway Traffic Noise - D02-02-21-0085
Planning2021-08-23 - Planning Rationale - D02-02-21-0085
Rendering2022-01-20 - Renderings - D02-02-21-0085
Shadow Study2021-08-23 - Shadow Study - D02-02-21-0085
Site Servicing2022-01-20 - Servicing Report - D02-02-21-0085
Site Servicing2021-08-23 - Servicing Stormwater Plans and Civil Drawings - D02-02-21-0085
Site Servicing2021-08-23 - Servicing Report - D02-02-21-0085
Stormwater Management2022-01-20 - Stormwater Management Report - D02-02-21-0085
Stormwater Management2021-08-23 - Stormwater Report - D02-02-21-0085
Surveying2021-08-23 - Survey Plan - D02-02-21-0085
Transportation Analysis2022-04-06 - Transportation Impact Assessment Strategy Report - D02-02-21-0085
Transportation Analysis2022-01-20 - Transportation Impact Assessment - D02-02-21-0085
2022-04-06 - Height Setback Schedule - D02-02-21-0085
2022-01-20 - Roof - D02-02-21-0085
2022-01-20 - Heritage Brief - D02-02-21-0085
2021-09-27 - Heritage Brief - D02-02-21-0085
2021-08-23 - Project Summary - D02-02-21-0085
2021-08-23 - Pedestrian Wind Analysis - D02-02-21-0085
2021-08-23 - Forecasting - D02-02-21-0085