The proposal by Cavanagh Developments is a mixed-use subdivision featuring 297 detached dwellings, 315 townhomes, and 116 back-to-back townhomes, totaling 728 residential units. The development also includes two commercial mixed-use blocks, a future school block, and various park and open space blocks.
Source:
City-provided description
and 2021-11-12 - Planning Rationale - D02-02-19-0090 (Page 1)
Status
Inactive (Zoning By-law in Effect)
Inactive (Zoning By-law in Effect)
Property Type
Residential
Commercial
Education
Parkland
Residential
Commercial
Education
Parkland
Building Scale (Max.)
Building scale inferred from proposed residential unit typologies (e.g. townhouse/single-detached).
Low-rise
Location#
Select a marker to view the address.
Project Updates#
Status Updated
- Status: Inactive (Zoning By-law in Effect)
Status Updated
- Status: Post Approval (By-law Passed - In Appeal Period)
Status Updated
- Status: Active (Application Recommended to Council for Approval)
Status Updated
- Status: Active (Notice of Public Meeting Sent)
Added description and 44 documents
- Status: File Pending (Application File Pending)
- The City of Ottawa has received a concurrent Draft Plan of Subdivision and Zoning By-law Amendment application to develop a 728-unit mixed-…
- 2022-07-26 - Proposed Zoning By-law Schedule - D02-02-19-0090
- 2022-07-26 - Northridge Street Tree Concept - D02-02-19-0090
- 2022-07-26 - Northridge Phasing Plan - D02-02-19-0090
- 2022-07-26 - Northridge On-Street Parking Analysis - D02-02-19-0090
- 2022-07-26 - Northride Walkway and Sidewalk Plan - D02-02-19-0090
- 2022-07-26 - Draft Plan 2 - D02-02-19-0090
- 2022-07-26 - Draft Plan 1 - D02-02-19-0090
- 2021-11-12 - TCR Addendum - D02-02-19-0090
- 2021-11-12 - Planning Rationale - D02-02-19-0090
- 2021-11-12 - Overall Storm Sewer System - D02-02-19-0090
- 2021-11-12 - Overall Sanitary Sewer System - D02-02-19-0090
- 2021-11-12 - Overall Watermain System - D02-02-19-0090
- 2021-11-12 - Grade Plan - D02-02-19-0090
- 2021-11-12 - Erosion and Sediment Control Plan - D02-02-19-0090
- 2021-11-12 - Draft Plan - D02-02-19-0090
- 2021-11-12 - Application Summary - D02-02-19-0090
- 2020-12-03 Woodlot S-23 Large Tree Inventory D02-02-19-0090
- 2020-12-03 Watermain System Plan D02-02-19-0090
- 2020-12-03 Transportation Impact Assessment D02-02-19-0090
- 2020-12-03 Storm Sewer System Plan D02-02-19-0090
- 2020-12-03 Sentinel Well Monitoring Memo D02-02-19-0090
- 2020-12-03 Sentinel Well Memo D02-02-19-0090
- 2020-12-03 Sanitary Sewer System Plan D02-02-19-0090
- 2020-12-03 Grade Control Plan D02-02-19-0090
- 2020-12-03 Geotechnical Investigation D02-02-19-0090
- 2020-12-03 Functional Erosion and Sediment Control Plan D02-02-19-0090
- 2020-12-03 EIS and TCR Addendum D02-02-19-0090
- 2020-12-03 Draft Plan D02-02-19-0090
- 2019-08-13 - Application Summary - D02-02-19-0090
- 2019-08-07 Transportation Impact Assessment D02-02-19-0090
- 2019-08-07 Stormwater Management Plan D02-02-19-0090
- 2019-08-07 Stormwater Management and Site Servicing Report D02-02-19-0090
- 2019-08-07 Sentinel Well Memo D02-02-19-0090
- 2019-08-07 Sanitary Sewer Plan D02-02-19-0090
- 2019-08-07 Planning Rationale D02-02-19-0090
- 2019-08-07 Phase 1 ESA D02-02-19-0090
- 2019-08-07 Noise Study D02-02-19-0090
- 2019-08-07 Grading Plan D02-02-19-0090
- 2019-08-07 Geotechnical Study D02-02-19-0090
- 2019-08-07 Erosion and Sediment Control Plan D02-02-19-0090
- 2019-08-07 Environmental Impact Statement and Tree Conservation Report D02-02-19-0090
- 2019-08-07 EIS and TCR Addendum D02-02-19-0090
- 2019-08-07 Draft Plan of Subdivision D02-02-19-0090
- 2019-08-07 Archeological Study Stage 1 D02-02-19-0090
Additional Information#
| Date Initiated | 2019-08-02 |
| Ward | Ward 4 - Cathy Curry |
| All Addresses | 1020 March Rd. 1070 March Rd. |
Documents#
Related Projects#
| Project | Last Updated | Date Initiated |
|---|---|---|
1020-1070 March Rd.