Ottawa Development Projects

101 Wurtemburg St.#

Last updated: 2016-06-03 · ID: D02-02-11-0023

Summary#

The proposal is for a 13-storey residential building containing 36 dwelling units, which will replace the existing dwelling. This development requires a Zoning Amendment to establish a maximum height limit of 45 metres, reduce visitor parking requirements to zero, and permit a reduced driveway width of 4 metres to access the underground parking garage, which will provide 18 spaces.

Source: City-provided description
Status
File Pending (Application File Pending)
Property Type
Residential

Building Scale (Max.) Based on elevation drawings. Values may be approximate. See sources for exact figures.
High-rise · 13 storeys Data Quality Note Text was extracted using optical character recognition. This may introduce artifacts or misreads. · 39.4 m Data Quality Note Height was partially estimated using visual scale. This may be approximate. Data Quality Note Text was extracted using optical character recognition. This may introduce artifacts or misreads.

Location#

Select a marker to view the address.

Project Updates#

2016-06-03 Initial Update
Added description and 32 documents
  • Status: File Pending (Application File Pending)
  • The proposed development includes demolishing the existing dwelling and constructing a 13-storey residential building with 36 dwelling unit…

Additional Information#

Date Initiated2011-04-04
WardWard 12 - Stéphanie Plante

Documents#

TypeDocument
Architectural PlansD02-02-11-0023 (Rev May 2016) Architectual Building Elevation Drawings
Architectural PlansD02-02-11-0023 (Rev May 2016) Architectual Building Elevation Drawings 2
Architectural PlansD02-02-11-0023 (Rev May 2016) Parking Garage Plan 1
Architectural PlansD02-02-11-0023 (Rev May 2016) Parking Garage Plan 2
Architectural PlansD02-02-11-0023 (Rev May 2016) Parking Garage Plan 3
Architectural PlansD02-02-11-0023 (Rev May 2016) Site Plan
Architectural PlansD02-02-11-0023 (Rev May 2016) Site Servicning Plan
Architectural PlansSite Plan D02-02-11-0023
EnvironmentalD02-02-11-0023 (Rev May 2016) Phase 1 Environmental Assesment
EnvironmentalEnvironmental Impact Statement - Part 3 D02-02-11-0023
EnvironmentalEnvironmental Impact Statement - Part 4 D02-02-11-0023
EnvironmentalEnvironmental Impact Statement - Part 5 D02-02-11-0023
EnvironmentalEnvironmental Impact Statement - Part 6 D02-02-11-0023
EnvironmentalEnvironmental Impact Statement - Part 7 D02-02-11-0023
EnvironmentalEnvironmental Site Assessment - Phase I D02-02-11-0023
Erosion And Sediment Control PlanErosion and Sediment Control Plan D02-02-11-0023
Geotechnical ReportD02-02-11-0023 (Rev May 2016) Geotechnical Study Memo
Geotechnical ReportGeotechnical Study - Slope Stability Study D02-02-11-0023
Geotechnical ReportGrading Plan D02-02-11-0023
Landscape PlanLandscape Plan D02-02-11-0023
PlanningD02-02-11-0023 (Rev May 2016) Planning Rationale
PlanningPlanning Rationale D02-02-11-0023
Shadow StudyD02-02-11-0023 (Rev May 2016) Shadow Study
Shadow StudySun Shadow Study D02-02-11-0023
Site ServicingAssessment of Adequacy of Public Services - Site Servicing Study D02-02-11-0023
Site ServicingD02-02-11-0023 (Rev May 2016) Site Servicing Brief
Stormwater ManagementD02-02-11-0023 (Rev May 2016) Stormwater Management Plan
Stormwater ManagementStormwater Site Management Report D02-02-11-0023
Stormwater ManagementStormwater Site Plan D02-02-11-0023
SurveyingD02-02-11-0023 (Rev May 2016) Survey Plan
D02-02-11-0023 (Rev May 2016) Grade Control & Drainage