Ottawa Development Projects

424 Churchill Ave. N.#

Last updated: 2024-12-28 · ID: D01-01-22-0011

Summary#

The City of Ottawa has received an Official Plan Amendment, Zoning By-law Amendment and Site Plan Control application to permit the demolition of a two-storey commercial building and the redevelopment of the site into an 8-storey residential apartment building containing 58 dwelling units, with three basement levels.

Status
Inactive (No Appeal - Official Plan Amendment Adopted)

Building Scale (Max.) Based on elevation drawings. Values may be approximate. See sources for exact figures.
Mid-rise · 8 storeys Data Quality Note Text was extracted using optical character recognition. This may introduce artifacts or misreads. · 25.5 m Data Quality Note Height was partially estimated using visual scale. This may be approximate. Data Quality Note Text was extracted using optical character recognition. This may introduce artifacts or misreads.

Location#

Select a marker to view the address.

Additional Information#

Date Initiated2022-10-25
WardWard 15 - Jeff Leiper

Documents#

TypeDocument
Adequacy Of Public Services2022-10-25 - Assessment of Adequacy of Public Serviceability Report -D01-01-22-0011
Application Summary2022-12-06 - Application Summary - D01-01-22-0011
Architectural Plans2024-05-06 - Site Grading and Servicing Plan Review - D01-01-22-0011
Architectural Plans2024-05-06 - Architectural Plans - D01-01-22-0011
Architectural Plans2022-10-25 - Plans - Fullset -D01-01-22-0011
Architectural Plans2022-10-25 - Architectural Package -D01-01-22-0011
Architectural Plans2024-08-20 - Architecture Plans - D01-01-22-0011
Architectural Plans2024-08-20 - Architecture Elevations - D01-01-22-0011
Civil Engineering Report2024-05-06 - Civil Plans - D01-01-22-0011
Civil Engineering Report2024-08-20 - Civil Plans - D01-01-22-0011
Environmental2024-05-06 - Phase II ESA - D01-01-22-0011
Environmental2022-11-25 - Phase II Environmental Site Assessment - D01-01-22-0011
Environmental2022-11-25 - Phase I Environmental Site Assessment - D01-01-22-0011
Environmental2024-08-20 - Phase Two Environmental Site Assessment - D01-01-22-0011
Geotechnical Report2024-05-17 - Hydrogeological Assessment Report - D01-01-22-0011
Geotechnical Report2024-05-06 - Geotechnical Report - D01-01-22-0011
Geotechnical Report2022-10-25 - Geotechnical Report -D01-01-22-0011
Geotechnical Report2024-08-20 - Hydrogeological Assessment Report - D01-01-22-0011
Landscape Plan2024-05-06 - Landscape Plan - D01-01-22-0011
Landscape Plan2022-10-25 - Landscape drawings -D01-01-22-0011
Landscape Plan2024-08-20 - Landscape Plan - D01-01-22-0011
Noise Study2022-10-25 - Traffic Noise - D01-01-22-0011
Planning2022-10-25 - Planning Rationale and Design Brief -D01-01-22-0011
Planning2024-08-20 - Planning Rationale Addendum 2 - D01-01-22-0011
Shadow Study2024-08-20 - Shadow Analysis - D01-01-22-0011
Stormwater Management2024-05-06 - Stormwater Management Report - D01-01-22-0011
Stormwater Management2022-10-25 - Stormwater Management Report- D01-01-22-0011
Stormwater Management2024-08-20 - SWM Report - D01-01-22-0011
Surveying2022-10-25 - Topographical Survey -D01-01-22-0011
Transportation Analysis2024-05-06 - TIA Addendum - D01-01-22-0011
Transportation Analysis2022-12-06 - Transportation Impact Assessment Strategy Report - D01-01-22-0011
Tree Information and Conservation2022-10-25 - Tree Conservation Report - D01-01-22-0011
Tree Information and Conservation2024-08-20 - Tree Conservation Report - D01-01-22-0011
Tree Information and Conservation2024-08-20 - Tree Conservation Plan - D01-01-22-0011
Wind Study2022-10-25 - Wind Study - D01-01-22-0011
2022-10-25 - Screening and Scoping Report -D01-01-22-0011
2024-08-20 - Details of Zoning and OPA - D01-01-22-0011